EFTA00676933.pdf
PDF Source (No Download)
Extracted Text (OCR)
From: Daphne Wallace
To: Jeffrey Epstein <jeevacation@grnail.com>
Cc: Rich Kahn
Jimmy Fraguela
Subject: Proposed Landing Site for WAPA link between LSJ and GSJ - August 10, 2017
Date: Thu, 10 Aug 2017 19:27:03 +0000
Attachments: Proposed_Landing_Site_for_WAPAiink_from_LSJ_to_GSJ_-_August_10,_2017.pdf
Greetings Sir,
Attached below is Mr. Fraguela's and Mt Felix Rey's (WAPA) proposed landing site on GSJ for the electrical
power cable from LSJ.
They are proposing following the same route as the cable from St. Thomas, and coming onto GSJ at a point that
will avoid disturbing the area that is known to contain an underwater grass that is protected.
Mr. Fraguela recommends digging a trench 3 feet in depth that will bring the cable from the point of landing to
the point that you have indicated you wish to have the main power vault constructed.
With you approval of Mr. Fraguela's proposal, he is requesting Ms. Dempsey dive the area to confirm that the
grass is not present. Plan drawings can then be created, sent to WAPA for final review and approval, and the
permit application submitted to DPNR.
Respectfully submitted,
Daphne
EFTA00676933
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA00676933.pdf |
| File Size | 45.3 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,165 characters |
| Indexed | 2026-02-11T23:28:41.213712 |