Back to Results

EFTA00677138.pdf

Source: DOJ_DS9  •  email/external  •  Size: 35.4 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

From: Larry Visoski <Ma> To: Je vacation <jeevacation@gmail.com> Subject: BBJ Date: Thu, 10 Aug 2017 13:55:24 +0000 Jeffrey seller is aware the 72 month inspection is coming due, Brian already mentioned this,. Paperwork a little conflicting, it's either due this year or next year„ Brian informed $500k budget„ we know that could grow to $750k„ During this inspection all the AUX tanks are removed„ it's a long inspection,. 60+ days. Just to keep in mind the Landing gear inspection is a 12 year item, as well as the biggest inspection The 12 year, most likely completed in Which makes it due in 2024., not that far away., $1M for gear overhaul, Plus the next 12 year airframe inspection. I agree with you„ it's $9M BBJ all day long,. Knowing that Boeing operated the aircraft for the past five years, mechanically I feel confident., Just some thoughts Sent from my iPhone EFTA00677138

Document Preview

Extracted Information

People Mentioned

Email Addresses

Document Details

Filename EFTA00677138.pdf
File Size 35.4 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 901 characters
Indexed 2026-02-11T23:28:45.899932

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files