Back to Results

EFTA00677701.pdf

Source: DOJ_DS9  •  schedule  •  Size: 50.1 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

From: Daphne Wallace czi To: Jeffrey Epstein <jeevacation@gmail.com> Cc: ann rodriquez Subject: Re: GSJ Cistern permit - February 3, 2017 Date: Thu, 23 Mar 2017 14:23:52 +0000 Attachments: CZM_CO_Form-Fillablen CZT-35-16L_-_FEB_3_2017.pdf Greetings Sir, Mr. Paul Kalloo of the CZM office confirmed that David Rosa is no longer with the department. He advised that he will be conducting the inspection. The first step is the submission of the completed Request for the issuance of a "Certificate of Use and occupancy". Mr. Kalloo asked the purpose of the cistern. I told him it is a water catchment structure only. Once Mr. Kalloo receives and reviews the document, he will schedule the inspection. With your permission, I can hand deliver the document today. Respectfully submitted, Daphne On Fri, Feb 3, 2017 at 11:35 AM, Daphne Wallace > wrote: Greetings Sir, Per your directive to have the GSJ Cistern permit closed, we are submitting to CZM the request in writing for the inspection of the cistern. Mr. David Rosa of the St. John office of CZM can come to GSJ on Tuesday, February 7 to meet with Danny to conduct the inspection. Once he has signed off, he will let us know what the next step is. Respectfully, Daphne EFTA00677701

Document Preview

Document Details

Filename EFTA00677701.pdf
File Size 50.1 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,258 characters
Indexed 2026-02-11T23:28:57.783950

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files