Back to Results

EFTA02237706.pdf

Source: DOJ_DS11  •  Size: 171.1 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

To: From: Larry Visoski Sent Tue 2/27/2018 9:29:57 PM Subject: Re: Update HiM„ so true about the 35 second delay while handling an emergency, no pilot really understands how they will address in emergency until it really happens to them most people may get tunnel vision and freeze,,, Captain Sully is exactly correct you need to have a delay when reenacting a real emergency,,, No apt for me,,, I'll be flying to Savannah Saturday„ Also Jeffrey said he may need to fly to New York on Friday, I'm sure there's something brewing or an event ,,,you probably are aware already Thx Larry Sent from my iPhone On Feb 27, 2018, at 2:50 PM, wrote: at the end when Sully requested they add in the 35 seconds to each live simulation attempt (to LGA and Teterboro) both models resulting in crashes...geez! the tears were coming down and my heart was pounding...I guess my heart was pounding through the entire movie though!! ....do you need an apartment as well since you will fly in on 3rd don't know where your task on March 5th at "SAV for the G550" is...? I guess NOT NY? On Feb 27, 2018, at 2:46 PM, Larry Visoski <a wrote: Ha!!! Yes amazing decision to land in the water!! Awesome movie!! Thx Fillet Bill and Dave know Thx Larry Sent from my iPhone On Feb 27, 2018, at 2:44 PM, a wrote: HI Larry....we have an apartment for both Dave and Bill...we have 7J and 10B... 7J code 10B cod EFTA_R1_01003414 EFTA02237706 Watched the movie last night "Sully"...Holy cow! I can't stop thinking about it ...truly such an amazing event...it seems impossible...was thinking about you! :) On Feb 27, 2018, at 12:44 PM, Larry Visoski- wrote: Hi Do you think you'll have Apt at 301 for Dave and Bill starting Saturday night? LMK Thx Larry V Sent from my iPhone On Feb 27, 2018, at 12:30 PM, wrote: thanks for the detailed itinerary! will include in JE's calendar On Feb 27, 2018, at 11:54 AM, Larry Visoski wrote: Rich and., update for your calendar: Spoke with JE„ update below, he wants pilots to stay in Paris during this visit., I-Dave and I fly Saturday March 3rd PBI-TEB. 2-Dave and Bill fly March 5th or 6th TEB-Paris., remain in Paris until March 12 or 13th and fly back to KTEB or EFTA_R1_01003415 EFTA02237707 KISP (Islip) maybe., Bill, plan on arriving EWR Monday morn or Sunday, depending on departure. 3-I will go to SAV for G550 completion Monday 5th I will test fly G550 March 9th with Chip or Neil. We will accomplish test flights and bring the G550 to Islip for Eric to start Work., 4-March 15th Pete will Pete / Meridian offered Thx Larry Sent from my iPhone input the GIV at Meridian TEB for 24month inspection,. a 10% Discount for the inspection, as well as 5% labor discount„ they had a maintenance cancellation which allowed us to commit to Meridian,. EFTA_R1_01003416 EFTA02237708

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02237706.pdf
File Size 171.1 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,886 characters
Indexed 2026-02-12T12:30:06.646579
Ask the Files