EFTA02237706.pdf
PDF Source (No Download)
Extracted Text (OCR)
To:
From:
Larry Visoski
Sent
Tue 2/27/2018 9:29:57 PM
Subject: Re: Update
HiM„
so true about the 35 second delay while handling an emergency, no pilot really understands how
they will address in emergency until it really happens to them most people may get tunnel vision
and freeze,,, Captain Sully is exactly correct you need to have a delay when reenacting a real
emergency,,,
No apt for me,,, I'll be flying to Savannah Saturday„
Also Jeffrey said he may need to fly to New York on Friday, I'm sure there's something brewing
or an event ,,,you probably are aware already
Thx
Larry
Sent from my iPhone
On Feb 27, 2018, at 2:50 PM,
wrote:
at the end when Sully requested they add in the 35 seconds to each live simulation
attempt (to LGA and Teterboro) both models resulting in crashes...geez! the tears
were coming down and my heart was pounding...I guess my heart was pounding
through the entire movie though!! ....do you need an apartment as well since you
will fly in on 3rd
don't know where your task on March 5th at "SAV for the
G550" is...? I guess NOT NY?
On Feb 27, 2018, at 2:46 PM, Larry Visoski <a
wrote:
Ha!!! Yes amazing decision to land in the water!!
Awesome movie!!
Thx Fillet Bill and Dave know
Thx
Larry
Sent from my iPhone
On Feb 27, 2018, at 2:44 PM, a
wrote:
HI Larry....we have an apartment for both Dave and
Bill...we have 7J and 10B...
7J code
10B cod
EFTA_R1_01003414
EFTA02237706
Watched the movie last night "Sully"...Holy cow! I can't stop thinking about
it ...truly such an amazing event...it seems
impossible...was thinking about you!
:)
On Feb 27, 2018, at 12:44 PM, Larry
Visoski-
wrote:
Hi
Do you think you'll have Apt at 301 for Dave and Bill starting
Saturday night?
LMK
Thx
Larry V
Sent from my iPhone
On Feb 27, 2018, at 12:30 PM,
wrote:
thanks for the detailed itinerary!
will include in JE's calendar
On Feb 27, 2018, at
11:54 AM, Larry
Visoski
wrote:
Rich and., update for your calendar:
Spoke with JE„ update below, he wants pilots to stay in
Paris during this
visit.,
I-Dave and I fly Saturday March 3rd
PBI-TEB.
2-Dave and Bill fly March 5th or 6th TEB-Paris., remain in
Paris until March
12 or 13th and fly
back to KTEB or
EFTA_R1_01003415
EFTA02237707
KISP (Islip)
maybe.,
Bill, plan on arriving EWR Monday morn or Sunday,
depending on
departure.
3-I will go to SAV for G550 completion Monday 5th
I will test fly G550 March 9th with Chip or Neil. We will
accomplish test
flights and bring the
G550 to Islip for
Eric to start Work.,
4-March 15th Pete will
Pete / Meridian offered
Thx
Larry
Sent from my iPhone
input the GIV at Meridian TEB for
24month
inspection,.
a 10% Discount for the inspection,
as well as 5% labor
discount„ they had
a maintenance
cancellation which
allowed us to
commit to
Meridian,.
EFTA_R1_01003416
EFTA02237708
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02237706.pdf |
| File Size | 171.1 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,886 characters |
| Indexed | 2026-02-12T12:30:06.646579 |