EFTA02244467.pdf
PDF Source (No Download)
Extracted Text (OCR)
To:
From:
eo o ung
Sent:
Thur 4/5/2018 2:11:37 PM
Subject: Re: Extra Linens and air mattress set up!
7J is doneII .sorry for that,its my mistake..
Sent from my iPhonc
On Apr 5, 2018, at 9:08 AM,
wrote:
Arrival today. It's ok. Just make it happpen as soon as you can today. Knock First.
I think they flew all night. We need set up day before arrival for Sophie so set up
April 10 please
Sent from my iPhonc
On Apr 5, 2018, at 9:04 AM, Leo Loking
> wrote:
Sorry for the confusion. I thought the set up is on the 5th which is
today.
Sent from my iPhonc
On Apr 2, 2018, at 9:29 PM,
wrote:
Reminder:
-We will need extra linens for Yoni and his
family (total of 4 pp) April 5-22. Air mattress set
up. They will stay in 7J
- We will also need extra linens and towels for
April
11-13 (total of 3) and an air
mattress set up They will stay In apt 2G
EFTA_R1_01019088
EFTA02244467
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02244467.pdf |
| File Size | 57.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 900 characters |
| Indexed | 2026-02-12T12:41:58.763910 |