EFTA02253699.pdf
PDF Source (No Download)
Extracted Text (OCR)
To:
LSJ GSJ[
Cc:
From:
Sent:
Mon 8/13/2018 1:16:04 PM
Subject:
Re: Tentative Schedule
Great to k ow! Thanks. Is Carlos set up to receive Jeffreys Flight alerts for
take off and landing? Or does Larry need to set him up?
Sent from my iPhone
> On Aug 13, 2018, at 9:10 AM, LSJ GSJ <
ote:
> Morning Lesley
> Thanks
> Please note Carlos Rodriguez is back working for LSJ and handles all JE's
airport pick ups, driving for him etc
> I have CC'd him on this traffic
> Jermaine is no longer doing this but will be used has a back up if required
> Warmest regards
> Karen
» On Aug 12, 2018, at 2:11 PM,
»
•
Below tentative schedule fro
>>
>> currently 19th to zorro . 24 th new york 25 lsj. - 29 , new york sept 1 paris
till 15th new york then 18 lsj till 25 new york till oct 1
EFTA_R1_01043806
EFTA02253699
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02253699.pdf |
| File Size | 43.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 829 characters |
| Indexed | 2026-02-12T12:51:43.969788 |