EFTA02255080.pdf
Extracted Text (OCR)
To:
From:
nre
t.•
Sent:
Mon 8/13/2018 3:49:29 PM
Subject:
Re: 8A bathroom
Hello.
All of the plumbing fitting were tightened. Toilet bowl was rechecked.
To make sure it was sealed properly. All caulking checked. Disinfected and
sprayed with pine Sol.
Sent from my iPhone
> on Aug 13, 2018, at 9:01 AM,
> Hi Andrew. Can you please give me a report on 8A bathroom? Our woman moved in
yesterday and before I email her to make sure All is ok I'd like to know what was
done. She will be staying for one month. Thanks.
> Sent from my iPhone
EFTA_R1_01047611
EFTA02255080
Document Preview
Extracted Information
Dates
Document Details
| Filename | EFTA02255080.pdf |
| File Size | 31.5 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 581 characters |
| Indexed | 2026-02-12T12:51:57.834596 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.