Back to Results

EFTA02255080.pdf

Source: DOJ_DS11  •  email/external  •  Size: 31.5 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

To: From: nre t.• Sent: Mon 8/13/2018 3:49:29 PM Subject: Re: 8A bathroom Hello. All of the plumbing fitting were tightened. Toilet bowl was rechecked. To make sure it was sealed properly. All caulking checked. Disinfected and sprayed with pine Sol. Sent from my iPhone > on Aug 13, 2018, at 9:01 AM, > Hi Andrew. Can you please give me a report on 8A bathroom? Our woman moved in yesterday and before I email her to make sure All is ok I'd like to know what was done. She will be staying for one month. Thanks. > Sent from my iPhone EFTA_R1_01047611 EFTA02255080

Document Preview

Extracted Information

Dates

Document Details

Filename EFTA02255080.pdf
File Size 31.5 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 581 characters
Indexed 2026-02-12T12:51:57.834596

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files