EFTA02253645.pdf
PDF Source (No Download)
Extracted Text (OCR)
To:
Cc:
From:
LSJ GSJ
Sent
Subject Re: Tentative Schedule
Mon 8/13/2018 1:10:35 PM
Morning
Thanks
Please note Carlos Rodriguez is back working for LSJ and handles all JE's airport
pick ups, driving for him etc
I have CC'd him on this traffic
Jermaine is no longer doing this but will be used has a back up if required
Warmest regards
Karen
> On Aug 12, 2018, at 2:11 PM,
wrote:
> Below tentative schedule from Jeffrey
> currently 19th to zorro . 24 th new york 25 lsj. - 29 , new york sept 1 paris
till 15th new york then 18 lsj till 25 new york till oct 1
EFTA_R1_01043726
EFTA02253645
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA02253645.pdf |
| File Size | 32.6 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 607 characters |
| Indexed | 2026-02-12T12:52:26.738135 |