Back to Results

EFTA02259448.pdf

Source: DOJ_DS11  •  Size: 49.7 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

To: Cecile de Jon h From: Sent: Thur 9/27/2018 4:57:30 PM Subject: Re: AYH Power Outage Wednesday, October 3, 2018 ugh..thanks for letting us know On Scp 27, 2018, at 12:38 PM, Cecile dc Jongh wrote: Please be advised that the management of AYH is replacing the transformer for the property. The transformer was damaged last year in the hurricanes. While they do this, the power has to be off as well as the generator which means our office will be without power or back up generator. This switch will be done from 7AM to noon next Wednesday. As such, the office will not be opened until 11:30AM on Wednesday, October 3, 2018. Thank you. With warm regards, Cecile de Jongh EFTA_R1_01055536 EFTA02259448

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02259448.pdf
File Size 49.7 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 721 characters
Indexed 2026-02-12T13:03:01.598714
Ask the Files