EFTA02259448.pdf
PDF Source (No Download)
Extracted Text (OCR)
To:
Cecile de Jon h
From:
Sent:
Thur 9/27/2018 4:57:30 PM
Subject: Re: AYH Power Outage Wednesday, October 3, 2018
ugh..thanks for letting us know
On Scp 27, 2018, at 12:38 PM, Cecile dc Jongh
wrote:
Please be advised that the management of AYH is replacing the transformer for
the property. The transformer was damaged last year in the hurricanes.
While they do this, the power has to be off as well as the generator which
means our office will be without power or back up generator. This switch
will be done from 7AM to noon next Wednesday. As such, the office will
not be opened until 11:30AM on Wednesday, October 3, 2018.
Thank you.
With warm regards,
Cecile de Jongh
EFTA_R1_01055536
EFTA02259448
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02259448.pdf |
| File Size | 49.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 721 characters |
| Indexed | 2026-02-12T13:03:01.598714 |