EFTA02274945.pdf
PDF Source (No Download)
Extracted Text (OCR)
To:
From:
Renato Leeson
Sent
Fri 2/15/2019 2:51:26 PM
Subject Re: Tentative schedule
Thanks
Renato Lacson
On Feb 15, 2019, at 9:04 AM,
wrote:
Please see below tentative schedule
LSJ sat feb 16. stop in domincan republic for lunch on tues. 19 then ny ti11
friday then zorro rnoncia:c. 25 dim, 28 then ny till sat march 2 then paris for 9
days. till march I I then lsj
Sent from my iPhone
EFTA_R1_01088396
EFTA02274945
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA02274945.pdf |
| File Size | 29.1 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 434 characters |
| Indexed | 2026-02-12T13:12:54.086346 |