From: Richard Kahn To: Ann Rodriquez Cc: Jeffrey Epstein Subject: Re: Staff Cottage: revised work schedule on cottage from Dave Date: Thu, 27 Apr 2017 11:04:13 +0000 i believe we have paid 2/3 of work (20k of 30k) yet job not 2/3 complete now he says he wants 3k draw and will use our labor - not fair nor our initial deal are we going to bill him back for our labor costs? not sure i understand his downtown due to noise? please advise thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor New York, NY 10022 tel 212-971-1306 fax 646-350-0954 cell 917-414-7584 On Apr 27, 2017, at 6:56 AM, Ann Rodriquez < > wrote: David Starofsky 6501 Red Hook PlazaSuite 201 St Thomas VI 309-912-2114 Revised Schedule for LSJ Cottage Rmodeling Apri 29th Start painting inside kitchen, Laundry and office areas Cannot finish painting rest of area due to electrical panel needs installed and air conditioners need replacing. May 1-5th install kitchen cabinets, exhaust hood for stove, appliances and interior doors. Also Hughes electric will install all plugs and lights for new addition. He was contracted for 4,000.00 with permision from Brice because Danny Vicers did not have time to complete it. He was not contacted to install new electric panel if this needs to be done it will be an additional cost. All electric originally was to be done by in house empoyees. This is based on hardware for doors to be bought May 8-12th Finish drywall rest of area bedroom and living area if AC and Electric panel is installed, work on finishing outside tile and outside deck if plumbing is finished for downspouts from roof. This is in house work. EFTA00679033 May 15-19th Finish lose ends until windows, doors and skylights come in. I placed an order for these March 16th and were to be here already. When I called about delivery he had not ordered them at all so when he ordered them delivery is Nay 19th May 22-May 31 install windows, doors and skylights. Then complete tile work inside and out need doors installed to finish tile. Roof and install gutters. Outside new area ready for exterior painting also have advised that it can be completed two weeks ago Up to this date I have had 76 hours of downtime due to noise which resulted in 280 man hours This is almost two weeks of time loss. I am sure that with Anna"s help to get electric panel resolved , plumbing work done, ac completed and painting to be done by in house we can complete this by above date. I have drawn 20,800.00 so far and balance of 9,200.00 is left. I will hold back 6,200.00 till job completed and draw 3,000.00 to pay employees til job finished. Ann R. Begin forwarded message: From: david starofsky Date: April 27, 2017 at 6:05:57 AM AST To: Ann Rodriquez < Subject: revised work schedule on cottage Reply-To: david starofsky Anna I have attached a revised schedule for your review. I know that with your help on electric panel, plumbing and completing new AC units we stick to this schedule Also I noted the amount of down time due to noise and Mr Epsteins requests. Thank you for your time and consideration on this Dave <revised Isj cottage schedulestf> EFTA00679034

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00679033.pdf
File Size 116.2 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,212 characters
Indexed 2026-02-12T13:40:15.149070
Ask the Files