Back to Results

EFTA00680019.pdf

Source: DOJ_DS9  •  Size: 131.8 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Richard Kahn To: Jeffrey Epstein <jeevacation@gmail.com> Subject: Fwd: Cables Date: Sat, 18 Feb 2017 15:11:25 +0000 Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor New York, NY 10022 tel fax cell Begin forwarded message: From: Amy Dempsey Subject: Re: Cables Date: February 18, 2017 at 5:46:04 AM EST To: Richard Kahn < Cc: Hugo Hodge < I have not been able to confirm the new route. It was too rough to dive week before last and last week we had to do ambient in St. Croix. I will not be available to check it until end of this next week, and will do so and then we can get back on track. It just happened that this fell in the mist of bad weather and things I could not schedule around. Amy Claire Dempsey, M. President, Bioimpact, Inc. Box 132 Kingshill St. Croix, U.S. Virgin Islands 00831 Fax bioirwicOislands.d. On Fri, Feb 17, 2017 at 3:13 PM, Richard Kahn < wrote: since we last spoke 10 days ago were you both able to visit site and map out most efficient path as per our conversations with mr epstein please advise thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor EFTA00680019 New York, NY 10022 tel fax cell On Feb 2, 2017, at 5:48 PM, Hugo Hodge < > wrote: Good afternoon Mr. Kahn, Per Mr. Epstein's request, Amy is working on a new landing for the cable. As soon as it is verified I will take a trip with her to map it out on the drawing. I must stress to you that the critical path remains the selection of the cable and giving Bryan Electric the notice to proceed on procuring the switchgear. Again, i strongly recommend the armored cable of Kerite. It is a better cable and I believe it will save you money in the long run. In discussing with Amy, there will also be some additional cost with the landing if Pirelli is selected because it is not armored in the same manner as the Kerite cable. Best, HH On Thu, Jan 26, 2017 at 9:30 AM, Richard Kahn < > wrote: Hugo, Clinton and Amy will be going to GSJ on Saturday to view the landing sites and then finalize any requirements. Clinton is supposed to communicate the information to you, and Amy will also communicate her suggested articulated pipe lengths, and then from that information i understand you will prepare the drawings specified in Amy's email below. Can you please give us a specific timeframe for completion as Amy cannot complete her application package without it and that we are trying to have Amy's application package completed by the end of the Second Week in February. Thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 tel fax cell Begin forwarded message: EFTA00680020 From: Amy Dempsey Subject: Fwd: Cables Date: January 25, 2017 at 12:07:31 PM EST To: Darren Indyke < Richard Kahn I am expecting the following information: Detailed Cable specifications/Drawing Site plan/cross sections for landings Details for landing structures , ie manholes, switching equipment Drawings for equipment Upland routes to switching equipment < I will be suggesting articulate pipe lengths based on landing configurations. Amy Claire Dempsey, M. President, Bioimpact, Inc. Box 132 Kingshill St. Croix, U.S. Vi it Islands 00851 Fax bioimpactaislands.vi, EFTA00680021

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00680019.pdf
File Size 131.8 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,318 characters
Indexed 2026-02-12T13:40:30.168082
Ask the Files