Back to Results

EFTA00683108.pdf

Source: DOJ_DS9  •  email/external  •  Size: 95.7 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

From: Daphne Wallace To: Jeffrey Epstein <jeevacation@gmail.com> Cc: Gary Kerney Emad Hanna Subject: JE Directives photos - May 27, 2011 Date: Fri, 27 May 2011 19:48:25 +0000 Attachments: Photo_4 - Owners_road cleaned.JPG; Photo_6 - mechanical_painting.JPG; Photo_10_- _hydroaa and_move t1;e_parrots back done.IPb; Photo_15 - _Mess on owners roal cleaned.JTG; PIToto 16_-_mess on side_of road_cleaned.JPG; hoto —18 -_de-rocl—c hillade_and_clean beaai_ongoing.ThGT Photo T9 - _pipes sh—owing_on:beach concealed.JFG; Photo 20 - step_in front_a nursety.JPG; Photo —2 lfl open_pipes_baind_Tiki_concealed.Ji'Gr PItoto_22—_- _sturd—y_wood_for massage_hut completed.JPG; Photo_25A_- _pipes_on Owners_road_conceaed.JPG; Photo_25B_- _pipes_on-_Owners road_concealed.JPG; Photo 26A_- fill in basket wit; cement_and make smootRer_in_progress.JPG; Photo 26B - _fill_in basket_with_cement and_make smoother_in_progress.JPG; Photo 27A_- _put_lig—hts_on_wall and_ma—ke_new_wal_on_ocean_side.JPG; Photo_27B-_- _put_lights_on_walCIPG; Photo_28_-_clean_up_mess.JPG Greetings Mr. Epstein, May 27 photographs pertaining to your directives of May 23, for your review and comments: Photo 1 - clean up top of hill - no action to date Photo 2 - road to pebble beach is too steep - Jules to work on this weekend Photo 3 - five palm circle - Gary working on the plan Photo 4 - Owner's road mess - cleaned (photo) Photo 5 - Pop's garden planting - waiting for equipment Photo 6 - mechanical painting - Gary will do your mock up (photo) Photo 7 - lanterns for columns - Gary would like to know if Sarah is searching? Photo 8 - coral stone instead of white on wall - working on the Chill lax room - this project is next Photo 9 - drainage for roads - Peter and Jules working on drainage Photo 10 - hydroseed and move the parrots back - the parrots are moved back (photo) Photo 11 - move Restoration Hardware chest to pebble beach house and wicker rocker - waiting for Brice Photo 12 - gravel drive - Jules this weekend Photo 13 - clean up pebble beach - Jules this weekend Photo 14 - deal with drainage - Jules this weekend Photo 15 - mess on Owner's road - cleaned (photo) Photo 16 - mess on side of road - cleaned (photo) Photo 17 - tennis fencing and paint and plaster of walls - not on schedule yet Photo 18 - de-rock hillside and clean beach - ongoing (photo) Photo 19 - pipes showing on beach - concealed (photo) Photo 20 - step in front of nursery; Ion should paint the floor with fish stencil design - Omar will do the face after the basket (photo) Photo 21 - open pipes behind Tiki - concealed (photo) Photo 22 - sturdy wood for massage hut - completed (photo) Photo 23 - plant on side of house - waiting on equipment Photo 24 - big bright cushion for Tiki - Sarah Photo 25 - more pipes on Owner's road (2 photos) Photo 26 - fill in basket with cement and make smoother - in progress (2 photos) EFTA00683108 Photo 27 - put lights on wall and make new wall on ocean side - conduit installed in center of columns (2 photos) Photo 28 - clean up mess (photo) Respectfully submitted, Daphne EFTA00683109

Document Preview

Extracted Information

People Mentioned

Dates

Email Addresses

Document Details

Filename EFTA00683108.pdf
File Size 95.7 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,127 characters
Indexed 2026-02-12T13:41:21.366824

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files