EFTA00686531.pdf
PDF Source (No Download)
Extracted Text (OCR)
From: Daphne Wallace
To: Jeffrey Epstein <jeevacation@gmail.com>
Subject: Re: Photographs - October 28, 2011
Date: Fri, 28 Oct 2011 21:26:01 +0000
Greetings Mr. Epstein,
My apologies. You were clear. Photographs regarding every project will be taken tomorrow morning and sent to
you.
Respectfully submitted,
Daphne
On Fri, Oct 28, 2011 at 4:22 PM, Jeffrey Epstein <jeevacation@gmail.com> wrote:
I clearly said that i wanted each and every project photogrpahed„ . you then send me a list that says items
highlighted WERE NOT prhotographed„ Maybe I was unclear„ I Would very much appreciate if each project
would be photed. each project on the list except if you prefer the pool ladders .
On Fri, Oct 28, 2011 at 4:54 PM, Daphne Wallace
> wrote:
Greetings Mr. Epstein,
October 28 photographs, including other items, for your review and comments. The items highlighted were
not photographed today:
1. Courtyard
2. Grading main engineering road
3. Finish Main pool shelter
4. Tennis court and other main lights
5. Cabana 4
6. Gym cabinet — preliminary budget finally sent to Rich 10/28
7. Cabana 4 furnishing
8. Flagpole bath and cabana
9. Main pool bath
10. Palm trees— 10/29
11. Sod — 11/5
12. Tiling
13. Main planter
14. Brice cottage
15. Dock house
16. Electrify info center
17. Five Palms
18. Grotto
19. Blue beach landscaping
20. Heli wall
21. Curb for all roads
22. Night lights to motor court
EFTA00686531
23. Steps to library
24. Library path
25. Benches
26. Driveway entry
27. Pool ladders
28. Flagpole lights are too hot
29. Flagpole grading
30. New Flagpole wall
31. Stereo —punch down pending
32. Computer — iMAC - Sarah ordered online, being sent to NY, will bring to LSJ on next visit
35. Midnight Express — trailer being painted —shipping out of FL 11/7, estimated date of arrival 11/15
36. Library landscaping
38. Color in basket
39. Waterfall — my error — the batteries died right after I took these photographs and they were not saved —
I will redo on Monday
40. Banquette
41. Big wind doors
42. High Flagpole road
44. St. John terrace
45. Hangar —floor sanding in progress
46. Motor court
47. Archer platform
48. Bed
49. Plants bought from Italian woman
51. Steel shed for the new workshop area
52. Helicopter like lights for top of the columns
53. Night lighting — bench, stairs, path to library
54. Triangle
55. Dock house tree lights
56. Kitchen statue - light brought out
57. Solar fridge, light, fan for pebble beach
58. Humidifiers
59. Bottle palms and red thorns replace
60. Tree layout
61. Mosaic light
62. Yellow flowering Alamandra up Old Mill wall
63. Beach 3 — containers into back of hill
64. Gary's hot tub
Other items:
New steps off Relax room
Respectfully submitted,
Daphne
EFTA00686532
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00686533
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Document Details
| Filename | EFTA00686531.pdf |
| File Size | 138.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,423 characters |
| Indexed | 2026-02-12T13:42:03.054368 |