Back to Results

EFTA00694700.pdf

Source: DOJ_DS9  •  Size: 112.3 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Jeffery Edwards <jeevaeationggmail.com> To: Bob Anderson , Curtis Royston Subject: Re: LSJ next phase: Design Development & Consultant Coordination Date: Mon, 13 Apr 2009 17:31:55 +0000 please Coordonate with curtis rather than doug „ thanks On 3/11/09 6:21 PM, "Bob Anderson" wrote: Jeffrey- We are ready to proceed into the design development phase of the project, but need to take care of a couple of things first. 1. Aside from the comments you emailed previously and discussed with me on the phone (regarding the pavilion bathrooms, pavilion side entrances, pavilion basement access & service, and concept palette #1) do you have any other questions/comments? 2. Warwick (my project manager) has been working with Doug on the final proposal, as well as retainer invoices we need (for us and our consultants) to begin coordination. Structural, MEP, lighting, A/V, pool and landscape consultants are ready to start. Please let me know if you need any other information regarding the Design Development retainers. (note: helipad garage, dock house, and pathway between main house & office will be a separate Schematic Design set, which will ultimately be added to the DD set) We're looking forward to getting our consultants together and progressing the design! EFTA00694700 Regards, Bob Bob Anderson Senior Associate Gensler 2500 Broadway Suite 300 Santa Monica California 90404 USA From: Warwick Wicksman Sent: Thursday, March 05, 2009 4:40 PM To: Cc: Amber Ratliff; Bob Anderson Subject: RE: Little St James Attached are Invoices for our DD retainer, and the Consultants SD retainer. Thanks, Warwick Warwick Wicksman, AIA Principal Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA From: Warwick Wicksman Sent: Thursday, March 05, 2009 3:47 PM To: Cc: Bob Anderson; 'Darren Indyke' Subject: Little St James Doug, Good speaking with you earlier! We are so glad you and Mr. Epstein are happy with the design and the progress of the work at Little St James! I forwarded the proposal and a cover note to Bob, and he is EFTA00694701 going to send that on to Mr. Epstein. As we discussed, we really need to keep the team moving forward. I would like to kick off the DD phase for us next week, and get the consultants moving forward with their work. We need to get MEP and Structure, along the others. At this point, we have used up our entire SD fee, so to get the next phase moving, we need the next retainers. For Architecture, the next retainer is $50,000 (DD retainer). For the consultants, the retainer is $33,875 (50% of their SD fee). These are each outlined in the proposal (attached for reference). Please let me know when I can expect a transfer. Also, as a reminder, please advise on the status of the reimbursables invoice from December (also attached). Thanks! Warwick Warwick Wicksman, AIA Princi al Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA EFTA00694702

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00694700.pdf
File Size 112.3 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,989 characters
Indexed 2026-02-12T13:44:08.157577
Ask the Files