EFTA00694700.pdf
PDF Source (No Download)
Extracted Text (OCR)
From: Jeffery Edwards <jeevaeationggmail.com>
To: Bob Anderson
, Curtis Royston
Subject: Re: LSJ next phase: Design Development & Consultant Coordination
Date: Mon, 13 Apr 2009 17:31:55 +0000
please
Coordonate with curtis rather than doug „ thanks
On 3/11/09 6:21 PM, "Bob Anderson"
wrote:
Jeffrey-
We are ready to proceed into the design development phase of the project, but need to
take care of a couple of things first.
1. Aside from the comments you emailed previously and discussed with me on the phone
(regarding the pavilion bathrooms, pavilion side entrances, pavilion basement access & service,
and concept palette #1) do you have any other questions/comments?
2. Warwick (my project manager) has been working with Doug on the final proposal, as well as
retainer invoices we need (for us and our consultants) to begin coordination. Structural, MEP,
lighting, A/V, pool and landscape consultants are ready to start.
Please let me know if you need any other information regarding the Design Development
retainers.
(note: helipad garage, dock house, and pathway between main house & office will be a separate
Schematic Design set, which will ultimately be added to the DD set)
We're looking forward to getting our consultants together and progressing the design!
EFTA00694700
Regards,
Bob
Bob Anderson
Senior Associate
Gensler
2500 Broadway Suite 300
Santa Monica California 90404
USA
From: Warwick Wicksman
Sent: Thursday, March 05, 2009 4:40 PM
To:
Cc: Amber Ratliff; Bob Anderson
Subject: RE: Little St James
Attached are Invoices for our DD retainer, and the Consultants SD retainer.
Thanks,
Warwick
Warwick Wicksman, AIA
Principal
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
From: Warwick Wicksman
Sent: Thursday, March 05, 2009 3:47 PM
To:
Cc: Bob Anderson; 'Darren Indyke'
Subject: Little St James
Doug,
Good speaking with you earlier! We are so glad you and Mr. Epstein are happy with the design and the
progress of the work at Little St James! I forwarded the proposal and a cover note to Bob, and he is
EFTA00694701
going to send that on to Mr. Epstein.
As we discussed, we really need to keep the team moving forward. I would like to kick off the DD phase
for us next week, and get the consultants moving forward with their work. We need to get MEP and
Structure, along the others. At this point, we have used up our entire SD fee, so to get the next phase
moving, we need the next retainers.
For Architecture, the next retainer is $50,000 (DD retainer). For the consultants, the retainer is $33,875
(50% of their SD fee). These are each outlined in the proposal (attached for reference).
Please let me know when I can expect a transfer. Also, as a reminder, please advise on the status of the
reimbursables invoice from December (also attached).
Thanks!
Warwick
Warwick Wicksman, AIA
Princi al
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
EFTA00694702
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00694700.pdf |
| File Size | 112.3 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,989 characters |
| Indexed | 2026-02-12T13:44:08.157577 |