Back to Results

EFTA00695046.pdf

Source: DOJ_DS9  •  Size: 108.2 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Brice Gordon To: Jeffrey Epstein <jeevacation@gmail.com> Cc: Zorro Ranch <zorro.oftice@gmail.com> Subject: Re: Date: Mon, 11 May 2015 15:40:12 +0000 Project Status below Movie Room: New equipment install completed Gun Cabinet panels and refurbishment of Blackouts, completion 13 th May Chaises and Chairs ordered, estimated delivery 22nd June Pool/Gym system Work to be completed 19th May Surge Protection Work to be completed 19th May Main Distribution Pumps New Skid ordered, estimated delivery,last week of May, 3 day install. Present status, have one pump running, manual operation only,. I can not control the cooling tower make up water cycles therefore only have poolpak online to lessen demand on cooling tower. All other heat pumps are off. Irrigation is running . I can not guarantee how long this motor will last. Outdoor Rugs Ordered, expect delivery date estimated first week of June Bunkhouse Sofa ordered due mid June Outside Furniture Lodge Sourced material to construct furniture, it appears it will be more economic to purchase rather than make "in house" will have firm numbers Wed JJ's Bunkhouse windows and doors have been ordered, install scheduled for last week of June Lodge Deck Roof, install scheduled for the 18th May, 3 days work. LV Tennis Court resurface, Scheduled for after Memorial Weekend, need wanner dryer weather pattern Painting Workshop and wash bay interior completed Pole Barn and Eves of Workshops completion this week Picket Fences/Fence Line - RC & LV, need wanner temps and consistence weather pattern, Estimate starting next week if possible. BH once windows doors installed Chees fountain basin sealed, completed Landscaping Hydroseeder, ordered awaiting delivery date confirmation, estimated mid June EFTA00695046 Seed is on sight Laying of Sod Pool area, completion 13 May, Westwind Landscape Con will be submitting proposal for Log Cabin today, Planter Beds MH due Wednesday. Lindens for Chess Set area to be picked up this week Still sourcing large cottonwoods for RC LV spring cleaning, mulch and irrigation repairs completed. regards Brice On Mon, May 11, 2015 at 7:51 AM, jeffrey E. <jeevacation@gmail.com> wrote: status of projects? please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of WE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation@gmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved Brice Gordon Stanley, NM Ph EFTA00695047

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00695046.pdf
File Size 108.2 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,897 characters
Indexed 2026-02-12T13:44:14.421135
Ask the Files