EFTA00709075.pdf
PDF Source (No Download)
Extracted Text (OCR)
From: ion nicola <
To: Jeffrey Epstein <jeevacation@gmail.com>
Subject: RE:
Date: Thu, 23 Dec 2010 01:06:18 +0000
Importance Normal
ok, i will do that after i will meet tomorrow
and talk about cabana no 3
thank you,
ion
Date: Wed, 22 Dec 2010 19:55:26 -0400
Subject: Re:
From: jeevacation@gmail.com
To:
please provide me with a professional schedule„ ex caban 1 scheduked finish date ---, caban 2„ finsih date. library„ we
would be further ahead, if we had known earlier that you needed help.
On Wed, Dec 22, 2010 at 7:39 PM, ion nicola <
> wrote:
hi Jeffrey,
sorry about i wanted to go in new york and stay till after christmas eve.. i thought nobody is going to be here until
beginning of january.
i thought you know about this... a few days ago
asked me when do we want to leave for christmas because she
wanted to book our tickets, and then yesterdays asked me when do i want to come back..so i told him begining of
january..i didnt know that you dont know about it. sorry.
sincerely talking, i would like to take a brake..i was here for a month.
if i would have had one more person working in the master bedroom beside my girlfriend, it would have been done by
now the room and the vestibule but i couldnt find someone else available for this period. and i didnt concentrate into
master bedroom because they told me that is going to take more time for finishing the master bathroom, and even i
would have finished with venetian plaster, you wouldnt be able to use the master bedroom untill the bathroom will be
done.
thats why i worked in cabana no 1, to be done and then you can use that.
anyway, i finished today the bathroom in cabana no 1 and looks very good with the white counter top.. you will see. so
now if the painters will paint the doors and the crown molding white, that will be done.
cabana no 2 is done too after the painters will paint the ceiling. so no 1 and no 2 are almost done.
cabana no 3.
is giung to show me the design tomorrow morning.
for master bedroom i think to finish the room and the vestibule i need like 5 days, and 3-4 days for the other 2 small
rooms.
my girlfriend put three coats of venetian plaster in the big room in master bedroom and two coats in vestibule, so the
room needs one more coat maybe two here and there , and the vestibule 2-3 coats, then the design, and after that two
coats of wax and then burnishing, then there are those two small rooms needs the entire process.
sorry my girlfriend cant stay longer, she has schedule a grafic design job ..she has to be in new york next week and
shes going to be busy for a while with that.
maybe i can bring another friend in january, so he can work in master bedroom while I'm doing the cabana no 3., so
then we can finish before january 15th both.
so now i ask you because nobody asked you before.can i take a brake until beginning of january?
even i go for christmas and come back monday, then will be only three days of work, tuesday, wed, and thursday.
Hold
me that friday nobody is going to be at the island.
EFTA00709075
thank you,
ion
***********************************************************
The information contained In this communication is
confidential, may be attorney-dient privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00709076
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Email Addresses
Document Details
| Filename | EFTA00709075.pdf |
| File Size | 98.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,771 characters |
| Indexed | 2026-02-12T13:48:42.842867 |