EFTA00710471.pdf
Extracted Text (OCR)
From:
To: Jeffrey Epstein
Cc: Rich Kahn
Leighton Allenby a,
Zorro
Ranch
Subject: ZDC MH PB Phase2
Date: Thu, 27 Aug 2015 16:17:29 +0000
Attachments: ZDC.PB_Grade_Stake.pdf; ZDC_MH_PB.JPG; ZDC.PB2.JPG;
ZDC_PB_North_Eastem_Comer 2.JPG; ZDC_PB_North_Eastem_Comer.JPG;
ZDC PB South Comer.JPG; ZDC_PB_South_Eastem Comer.JPG; ZDC.Backfill.JPG
Jeffrey
Attached for your reference:
I: Surveyed layout with grade stakes fill (F) and cut (C) requirements
2: Photos taken from master bedroom terrace and at each corner point
Please note:
This layout extended another 25ft past the layout marked out during your visit.
It will require more tree removal and is 9 plus feet below grade.
If we are to proceed with this layout, this corner will need some sort of retaining wall constructed. this can be done with rocks and fill, but
it will add to the scope of work.
Septic System is out lined on sketch, should not be an issue unless we dig.
We will need to change access to tanks thru dog pen as discussed.
As of date we are proceeding with stock piling dirt for both MH and Log Cabin Projects
Monday we will start hauling dirt to each location
Please confirm if we should proceed with this layout, as per sketch.
Regards
Stanley, NM
Ph:
EFTA00710471
Document Preview
Extracted Information
People Mentioned
Document Details
| Filename | EFTA00710471.pdf |
| File Size | 42.6 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,264 characters |
| Indexed | 2026-02-12T13:49:07.212228 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.