Jeffrey:
Here is what I've been working on:
I. Coordinating detail site construction on the Office Pavilion landscaping such as walls, grading, lighting,
irrigation, and landscaping. This is where most of my effort has been taking place because we have most of the
construction crew working there. Believe me, there are many details that have to be worked out in the field. It's
good to be here because I can address an issue as it comes up.
2. Kite House — I had sent you a new Option `C' which I didn't have at our meeting at your house. I wanted to
see if you had any comments on it? In order to make a submittal to the Coastal Zone, we will need to produce
more detailed plans and I need your comments before we can finalize the plans.
3. Coastal Zone Submittal — I have been putting together drawings for the Coastal Zone submittal on the Fire Pit,
Wood Deck, Helipad Arrival Building and the New Kite House. This is work that the McGuire Group did in the
past for a pretty big fee and I am doing the submittal package instead of them so it's more cost effective. I will
also address the Boat Dock building with CZM when we meet. The Boat Dock submittal needs to be a separate
submittal because we don't want to hold up the approval on anything else. Due to the holiday season, we could
not schedule the CZM meeting until early January so we are putting together the package now for that meeting
with Maria Hodge at that time.
4. Mechanical Building Site Plan — I've been working with Gary on a revised site plan for the mechanical
building area. This is a complicated area and requires a detailed site plan & landscape plan. I know it's
considered to be the back-of-house but it really needs to be thought through.
5. Terraced Vegetable Garden — I'm finishing up a detail landscape plan for the Terraced Vegetable Garden &
Tiki area and will forward that for your review. Gary will discuss the schedule on Sunday.
6. Main House Expansion — I've also been coordinating detail landscape site designs for the Gensler plans such
as paving, landscaping & lighting.
7. Private Drive — I'm doing detail landscape plans for your Private Drive area. The area is very tight and we to
address grading, utilities & landscape screening for some of the unsightly areas along the service drive.
Is there anything in particular, other than this that you wanted to see? Call me at (614-206-1266) to discuss in
more detail.
Look forward to your call,
Stephen
STEPHEN M. CAPLINGER
Vice President Design & Planning
EFTA00710991
LANDMARK LAND COMPANY
4908 Brooksview Circle
New Albany, Ohio 43054
614-206.1266
From: Jeffrey Epstein [mailto:jeevacation@gmail.com]
Sent: Wednesday, December 16, 2009 3:02 PM
To: Stephen Caplinger
Subject: Re:
What i was asking is what have you been doing since we last met„ i have received little.. you showed me the
options for the kite house when you were here.
On Wed, Dec 16, 2009 at 2:50 PM, Stephen Caplinger <
>. wrote:
on LSJ this week and there is much progress. We poured the road sample today so we'll take pictures
tomorrow after it's cleaned up. I think you'll like it. I talked to Gary about schedule on the fire pit, vegetable
garden and private drive. He wants to review the schedule with you on Sunday when he comes in. Basically all
of your stone wall guys are busy finishing up the big wall project at your office pavilion and at the master
bedroom and when they finish that they'll be able to jump on the other projects. But we wanted to finish one area
before we moved to another.
I had sent you plans on the options for the kite house; do you have any comments? •
also doing a new plan for
the area behind the Tiki house and next to the terraced vegetable garden and I'll send it on Friday.
Sent from my iPhone
On Dec 16, 2009, at 3:16 PM, Jeffrey Epstein <jeevacation®gmail.com> wrote:
please tell me what is happening .. I told gary i have had no questions are contact with you since the last time
you were here.. i have not been asked to decide any drawing road, firepit or irrigation, vegatable garden. path ..
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
destroy this communication and all copies thereof,
including all attachments.
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
EFTA00710992
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
destroy this communication and all copies thereof,
including all attachments.
EFTA00710993
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Phone Numbers
Document Details
| Filename | EFTA00710991.pdf |
| File Size | 174.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 5,479 characters |
| Indexed | 2026-02-12T13:49:14.828767 |