Back to Results

EFTA00715903.pdf

Source: DOJ_DS9  •  Size: 124.5 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

To: Jeffrey Epstein <jeevacation@gmail.com> Cc: Daphne Wallace < >, Danny Vicars Subject: Re: Punch List with Danny's Updates - September 14, 2012 Date: Fri, 14 Sep 2012 23:42:44 +0000 OK On Fri, Sep 14, 2012 at 7:37 PM, Jeffrey Epstein <jeevacation@gmail.com> wrote: have brice review specs for shed and get it ordered. On Fri, Sep 14, 2012 at 4:22 PM, Daphne Wallace < > wrote: Greetings Mr. Epstein, Attached for your review and comments, the punch list reviewed and updated with Danny this afternoon. Karen will update with her notes from the meeting with you today, and send for your review and comments the final updated Punch List. As requested, for your review and comments: Barge progress: reported by Danny I. Subbase Drydock work completed 9/6. 2. Big N picked up 9/10 and presently at AYH dock. 3. Portions of the in house work out for bid - Lester Browne bidding on the cleanup and door and window installation. "Jersey Bob" bidding on the electrical/gauges/engine work, and the installation of the hydraulic lines to the hydraulic cylinders (rams). 4. If Lester and Bob do not submit their bids tomorrow, Danny will seek new bidders on 9/17. 5. A bid for the installation of the hydraulic rams is needed. The rams are scheduled to return from Diversified Yachts (PR) on 9/19. 6. Danny and Carlos might complete the installation of the doors and plexiglas windows themselves - this will be completed last to minimize damage. Little C: reported byClos I. The engine is reinstalled on the boat. 2. Will splash on Monday, 9/17. 3. Offshore Marine is coming out on 9/17 to complete diagnostics with their computer. Engineering Shed Bids: quotes summarized by Carlos ESCO Manufacturing - l. Puerto Rico company. 2. Sixty day manufacturing time for the shed. 3. $24,800 for the building quoted (40' by 60'). 4. No crew provided for installation. 5. LSJ responsible for the cement work, footings and bolt installation prior to the arrival of the building. Buck Steel - I. Florida company. 2. Sixty day manufacturing time for the shed. 3. $42,790 for the building quoted (40' by 60'). EFTA00715903 4. (5) man crew available - $1800 per day, plus roundtrip airline, transportation, accomodations, food allowance - 5-7 day installation time. 5. LSJ responsible for the cement work, footings and bolt installation prior to the arrival of the building and crew. Internet at Five Palms: quotes summarized and sumbitted by Jermaine Liston Network Systems - $2,956.25 - Quote for the re-pull of the fiber from the generator junction to Five Palrns Cable & Corn - $ 342.00 - Quote for the fiber only and will have to be shipped to LSJ via Tropical Shipping Respectfully submitted, Daphne The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation@gmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved LSJ, LLC Island Manager Tel: Fax: EFTA00715904

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00715903.pdf
File Size 124.5 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,395 characters
Indexed 2026-02-12T13:50:24.451663
Ask the Files