Back to Results

EFTA00716375.pdf

Source: DOJ_DS9  •  Size: 94.2 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: brice gordon To: Jeffrey Epstein <jeevacation@gmail.com> Cc: Rich Kahn Subject: Big N Date: Thu, 04 Oct 2012 00:01:38 +0000 Attachments: Inline-Images: bargel.jpg; barge2jpg Jeffrey As requested attached are 3 quotes for work on Big N, also the present deck and storage conditions 1st quote from Bob Kassner, not to exceed price of $32,600.00 2nd quote from Sub Base Dry Dock for an estimated cost of $40,000.00 3rd quote from Island Rigging for hydraulic hose and fitting install, this work would be and in addition to BOTH quotes Please note the I also recieved a bid for Stainless steel fitting for 24K, I did not submit, fittings would out last hoses!!! please add $2,500.00 for misc items such as wiring, gauges, fire extinguishes, paint etc, all labor would be in house (LSJ Employees) My recommendation after reviewing scope of work is Have Bob Kassner do the work, LSJ to support and supply hydraulic fittings and hoses Barge would be located at LSJ or Red Hook depending on weather and work. This would allow us to oversee work and assist when needed directly At this time the Bilge cleaning, doors, plex glass windows have been completed, but as the photos show the rest of the barge needs TLC Monday 8th Big N will be brought to LSJ, complete clean will take place, it will take 2 days ( in house labor) Carlos will be in charge I can forward pictures of present condition, wiring, hydraulic fittings etc, if required. For your consideration Brice Gordon USVI Phone: New EFTA00716375 EFTA00716376

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Email Addresses

Document Details

Filename EFTA00716375.pdf
File Size 94.2 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,545 characters
Indexed 2026-02-12T13:50:30.703408
Ask the Files