Back to Results

EFTA00721946.pdf

Source: DOJ_DS9  •  Size: 1514.5 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

PANELING October 26th 2010 Molyneux Studio Juan Pablo Molyneux 250 Lexington Avenue New York, NY 10022 (212) 628-0097 SUBJECT: SAINT JAMES -DESIGNATED PUNCH LIST & PROPOSED NEW WORK Please find below the punch list and documentation provided 1. Punch List Items 2. Outstanding Arrears 3. New Work 4. New Work Items Removed from Punch 5. New Work 6. New Work: 7. New Work Items Removed from Photo 8. Not in Punch List 9. Not in Punch List Attachments 10. Punch List 11. Picture Log 12. Invoice 1098 13. Invoice 1096 14. Estimate 2010 15. Estimate 2013 16. Estimate 2014 17. Upon request 18. Panels Perforations 19. Upon request 24 EAST 64TH STREET NEW YORK. NY 10011 212 935 6537 fax MT 9)5 6538 infr@facellipmeling.com WWW.FANCELLI-PANTLING.COM As per September 8th List, with provided Picture Log reference and Comments. Past Due to remit prior to travel plans New Color Staining - Phase 1 New Color Staining - Phase 2 list as they are New Work Shutters' Marquetry Escutcheons Perforated Panels at the Tilt Top Desks: Log as they are not part of Punch List Columns seams cracks Carver signature on column September 8th email copy October 19, 2010 Outstanding Arrears Executed work Balance [2009] Outstanding Arrears Travel expenses Balance [2009] Shutters Marquetry and sketches New Color Staining - Phase One: Sample definition New Color Staining - Phase Two: Labor estimate Escutcheons Picture for approval of technique used estimate New Perforated Panels Installation ST) - Resolution Agreement - Oct 2010 Page 1 / 22 EFTA00721946 PANELING 1 PUNCH LIST ITEMS AS PER SEPTEMBER 8TH LIST, WITH PROVIDED PICTURE LOG REFERENCE AND COMMENTS ITEM # ITEM DESCRIPTION - SEPT 08 PUNCH LIST ITEM STATUS COMMENTS 1A Pictures 1. The decorative brass handles on the hardware holding the upper bookcases closed are systematically coming off. Item 1 / September 8 List: Pagel-4 OK Addressed and approved in March, 2010 Photograph transmitted to manufacturer for response and action 1B The small screw pins holding the handles to the rods are not only backing out, but also shearing off. OK Addressed and approved in March, 2010 Photograph transmitted to manufacturer for response and action Pictures Item 1 / September 8 List: Pagel-4 1C These handles require a solution and correction using custom pieces so that they will not continue to come off. OK Addressed and approved in March, 2010 Photograph transmitted to manufacturer for response and action Pictures Item 1 / September 8 List: Pagel-4 1D No Pictures in the alternative an additional $50,000 payment for the handles would be acceptable and they will become Mr. Epstein's issue; NO not acceptable Our client, Molyneux Studio, was charged at cost for the decorative hardware, less than $50,000.00 for all decorative hardware including: hinges, espagnolettes, pulls & handles ... 2A Pictures 2. The concealed hardware inside the swinging bookcases at the entry doors is falling off. Item 2 / September 8 List: Page 5 to 14 OK Approved in March, 2010 Photograph transmitted to manufacturer for response and action 2B The screws are too short for proper attachment to the wood. . OK Addressed and approved in March, 2010 Photograph transmitted to manufacturer for response and action Pictures Item 2 / September 8 List: Page 5-14 2C Pictures The keys that operate the locks are breaking Item 2 / September 8 List: Page 5-14 OK Not an issue in March, 2010 Photograph transmitted to manufacturer for response and action. 2D INTENTIONALLY OMITTED- SEE BELOW REMOVED from Punch List NEW ORDER INTENTIONALLY OMITTED SEE BELOW escutcheons at the keyholes are missing NEW ORDER 24 EAST 64TH STREET NEW YORK. NY 10021 212 935 6537 fax III 935 6538 iafoefaneellilearliag.tem wriv.rANctuu- PANE LI NG .COM ST) - Resolution Agreement - Oct 2010 Page 2 / 22 EFTA00721947 PANELING ITEM # ITEM DESCRIPTION - SEPT 08 PUNCH LIST ITEM STATUS COMMENTS 3 Pictures The hinges on the swinging bookcase doors are misaligned and require corrective action. Item 3 / September 8 List: Page15-18 Technical Limitation Not an issue in March, 2010 Bookcase used as concealed opening. Technical Issue linked to the type of design concept ordered. We can work on the issue and - somewhat improve it - but a perfect, flush and even alignment of swinging bookcases is not technically possible. 4 Pictures The connecting hardware at the sliding panels at the picture window is loose or broken Item 4 / September 8 List: Page19-20 OK New replacement mechanism has been ordered Issue will be fixed. 5 The wood filler pieces at the perforated frames around the sliding panels at windows require open joints to be filled so daylight does not shine through. OK Addressed and approved in March, 2010 The frames around the sliding panels as designed were intended to allow daylight to shine through Holes on carved frames can be filled in. Pictures Item 5 / September 8 List: Page 21-22 6A 6B Open joints in the woodwork, Especially at the cornice allow the cove lighting to Design Concept Addressed and approved in March, 2010 We can address the issue but there are limitations to our intervention: 1. Philosophy of the design concept requested: to look like 200 years old woodwork that has been salvaged from the depth of the sea. 2. Consequence of humidity damage from on site extended exposure to high humidity levels 3. Prospective contraction and expansion of wood at the sea side location Pictures shine through and must be filled. Item 6 from September 8 List: Page 23 to 37 7 Numerous carved pieces of wood at the cornice top edge are broken off and require repair and replacement. OK Addressed in March, 2010 and approved Will fix the elements showed in pictures Pictures Item 7 / September 8 List: Page 38-40 24 EAST 64TH STREET NEW YORK. NY 10011 211 935 6537 fax Ili 935 6538 iafeefaarellilearliag.tem WWW.TANCELLI-PANELING.COM ST) - Resolution Agreement - Oct 2010 Page 3 / 22 EFTA00721948 PANELING ITEM # ITEM DESCRIPTION - SEPT 08 PUNCH LIST ITEM STATUS COMMENTS 8 Several cabinet doors require adjustment to fit Design Concept & Technical Issue Not an issue in March, 2010 Hinges and Espagnolettes created for the project, are replicas of 17 century technology, not allowing for the adjustments that are possible with contemporary devices. Alignment issue can be addressed and somewhat improved - client request for alignment is not a feature of the chosen hardware technically cannot be 100% fulfilled Pictures evenly and square within their frames. Item 8 / September 8 List: Page 41-46 9 INTENTIONALLY OMITTED SEE BEI Ow REMOVED from Punch List NEW ORDER INTENTIONALLY OMITTED SEE BELOW The perforated panels at the tilt top desk panels NEW ORDER 10 INTENTIONALLY OMITTED SEE BELOW REMOVED from Punch List NEW ORDER INTENTIONALLY OMITTED SEE BELOW Shutters exterior sides NEW ORDER No item # Not in Punch List INTENTIONALLY OMITTED SEE BELOW REMOVED Not In Punch List INTENTIONALLY OMITTED SEE BELOW Columns seams cracks No item # Not in Punch List INTENTIONALLY OMITTED SEE BELOW REMOVED Not In Punch List INTENTIONALLY OMITTED SEE BEJ OW Carver signature on column No item # Not in Punch List Color Staining NEW ORDER NEW ORDER 24 EAST 64TH STREET NEW YORK. NY 10021 211 935 6537 fax In 935 650 ish@faxcellilexeling.rem WWW.FANCELL1-PANELING.COM STJ - Resolution Agreement - Oct 2010 Page 4 / 22 EFTA00721949 PANELING 2 OUTSTANDING ARREARS PAST DUE TO REMIT PRIOR TO TRAVEL PLANS Description Terms of payment Currency Invoice #1098 Balance on Executed approved work "Work Complement" Spring 2009 1000/0 prior to departure €22,500.00 Invoice #1096 Travel expenses May - June 2009 100% prior to departure $18,618.00 See Attachments copies of Invoices 3 NEW WORK: OUTSIDE PUNCH LIST NEW COLOR STAINING PHASE ONE: SAMPLE DEFINITION Estimate # 2013 Phase One: Sample definition Terms of payment Currency New Color - Sample Definition Required Molyneux Studio Designer on site with Finisher for of process and color approval 1 person 2 days €950 / per Day per Person 1000/0 on order €1,900.00 Supervision from Fancelli for approval and signature 1 person 2 days €1.200.00 / per Day per Person 1000/0 on order €2,400.00 Crew - Expenses 2 person 2 days $380.00 / per Day per Person 1000/0 on order $1,520.00* Air Fare $ 1,900.00 per Person 100% on order $3,800.00* * Note Expenses are estimated for a Low Season Basis 24 EAST 64TH NEW YORK. NY 10021 III 935 6537 fa 212 935 653E isfrefericelli WWWFASULLI PANCL1NOCOM ST) - Resolution Agreement - Oct 2010 Page 5 / 22 EFTA00721950 e.%/leet PANELING 4 NEW WORK: OUTSIDE PUNCH LIST NEW COLOR STAINING PHASE TWO: PROJECTED LABOR STAINING Following the definition of the staining sample PHASE ONE we will be able to assess the amount of work necessary to execute the finish expected. The intervention is also likely to require some de-installation of cornices and columns Please find below an "estimated" price range / bracket Estimate ft 2014 NEW COLOR - ESTIMATED LABOR Terms of payment Amount Range FROM TO NEW COLOR NEW COLOR NEW COLOR - EXPENSES SUPERVISION LABOR Projected New Color - Staining Labor €950 / per Day per Person 4 persons 20 to 24 days 80% on order 20% on completion €19,000.00 €22,800.00 Projected New Color - Carpenter Labor €950 / per Day per Person 2 persons 7 days to 21 days 80% on order 20% on completion €13,300.00 €39,900.00 NEW COLOR - PROJECTED EXPENSES New Color - Expenses Staining Crew $380.00 / per Day per Person 4 persons 20 to 24 days 100% on order $30,400.00 $36,480.00 Staining Crew Flights $1,900.00 / per Person 4 persons 100% on order $7,600.00 $7,600.00 New Color - Expenses Carpenter Crew $380.00 / per Day per Person 2 persons 7 days to 21 days 100% on order $5,320.00 $15,960.00 Carpenter Crew Flights $1,900.00 / per Person 2 persons *air fare can be shared with color staining intervention for carpenters 100% on order *$3,800.00 *$3,800.00 NEW COLOR — SUPERVISION & APPROVAL New Color - Supervision from Fancelli for approval and signature 1 person 2 days €1.200.00 / per Day per Person 100% on order €2,400.00 €2,400.00 Air Fare $ 1,900.00 per Person 100% on order $1,900.00 $1,900.00 * Note Expenses are estimated for a Low Season Basis 24 EAST 64TH NEW YORK. NY 10021 III 935 6 537 fax 211. 935 653E infr@fancelli VIIMIANCEM-PANCLING.COM STl - Resolution Agreement - Oct 2010 Page 6 / 22 EFTA00721951 tWitlela PANELING 5 NEW WORK: REMOVED FROM PUNCH LIST MARQUETRY Item # REMOVED FROM Punch List NEW ORDER The exterior sides (the side facing out and viewable from the exterior when looking into the windows) of the 10 sliding panels are completely unfinished and look like mere plywood. They are incomplete and need to be completed. No Item 10 / September 8 List: No Pictures Pictures Outside the scope of the Purchase Order. Both sides of the sliding panels were to receive leather upholstery. We have designed and submitted a pricing to Molyneux Studio for marquetry, Pricing below estimate #2010 Alternatively, we can furnish and install an oak veneer Marquetry for Shutters Terms of payment Currency Marquetry for Shutters 500/0 on order 30% prior to delivery €47,992.00 Production Shipping Installation 20% at completion Estimate it 2010 Marquetry for Shutters - Expenses 2 persons 5 days $380.00 / per Day per Person 100% on order $3,800.00* Air Fare $ 1,900.00 per Person 2 persons 1000/0 on order *$3,800.00* *air fare can be shared with color staining intervention for carpenters * Note Expenses are estimated for a Low Season Basis 6 NEW WORK: REMOVED FROM PUNCH LIST ESCUTCHEONS Item # REMOVED FROM PUNCH LIST NEW ORDER and the escutcheons at the keyholes 2D are missing Intentionally omitted see below Pictures Item 2 / September 8 List: Page 5-14 24 EAST 64TH STREET NEW YORK. NY 10011 Ill 935 6537 fax 111 935 6538 ifffe@facellipmeling.com FAACELLI-PANELING.COM Escutcheons plates are not part of the design. Existing Brass Key holes filets have been approved Designer to provide escutcheons design approved by client. Manufacturer will be contacted for pricing and schedule ST) - Resolution Agreement - Oct 2010 Page 7 / 22 EFTA00721952 l'ANFLINU 7 NEW WORK: REMOVED FROM PUNCH LIST PERFORATED PANELS AT THE TILT ToP DESKS Item REMOVED FROM PUNCH LIST NEW ORDER The perforated panels at the tilt top desk panels are consistently unfinished on the right side. The perforations on the left side are 9 shaped like flower petals, while the perforations on the right are simply drilled. The photo of the Escorial Library and the shop drawings indicate the perforated panels are to match on each side. No Item 9 / September 8 List No Pictures Pictures Existing design was approved. As per sent and attached technical report image - the proposed solution needs approval from designer and client The new panels production with matching perforations will be accomplished without cost. A priring for on site installation labor will be provided. 8 NEW WORK: ILLUSTRATEDNOT IN PUNCH LIST COLUMNS SEAMS CRACKS Item tt REMOVED from Picture Log List Not in September 8th punch list o Philosophy of the design concept requested: to look like 200 years old woodwork that has been salvaged from the depth of the sea. o Consequence of humidity damage from on site extended exposure to high humidity levels o Prospective contraction and expansion of wood at the sea side location. Repair cannot be ancticipated to be permanent Not in Punch List Columns seams cracks Pictures Item / September 8 List: Page 47 to SO 9 NEW WORK: ILLUSTRATEDNOT IN PUNCH LIST CARVER SIGNATURE ON COLUMN ITEM# REMOVED from Picture Log List Not in Punch Carver signature on column List Pictures Item / September 8 List: Page 51 24 EAST 64TH STREET NEW YORK. NY 10011 Tii 9)5 65)7 fax ITT 9)5 65)13 infr@facellipmeling.com ram FAACELLI-PANELING.COM Not in September 8w punch list This is the wood carver original signature, part of the work. ST) - Resolution Agreement - Oct 2010 Page 8 / 22 EFTA00721953 e711/ZCee PANELING NOTES BELOW Extension of Work Period: any extension will be estimated and payable 100% prior to the extension Humidity levels will be checked on site at the time of sample production to confirm that color staining intervention is possible Apart from Fancelli crew and Fancelli subcontractors, no other work and dust producing activities can be executed as we work on the room. Notice of completion will be given 6 days prior to work completion and Work Approval must be received in writing, within 3 days of notice of completion. Work Approval will be provided by Molyneux Studio, following the format previouly used [March 22nd 2010] [Illustrated, referencing punch list itemization, and approval comment]. Not Included: 2 movable scaffoldings required - provided by client. Not Included: Client to provide transportation to and from Little St James Monday to Saturday As per previous intervention, work schedule Monday to Saturday full day Included: Material - send on site Shipment of paints, colors, protection equipment All expenses are estimated for a Low Season Basis and will be adjusted to the intervention period. 24 EAST OATH NEW YORK. NY 10021 III 935 6537 fax III 935 653E ish@fancelliteneling.rom IITIVC.FAACEILI PANUANG.COM ST) - Resolution Agreement - Oct 2010 Page 9 / 22 EFTA00721954 PANELING PUNCH LIST SEPT 8th 2010 Sent from my BlackBerry wireless device From: Jeffrey Epstein Date: Wed, 8 Sep 2010 09:16:48 -0400 To: ja> Subject: 1. The decorative brass handles on the hardware holding the upper bookcases closed are systematically coming off. The small screw pins holding the handles to the rods are not only backing out, but also shearing off. These handles require a solution and correction using custom pieces so that they will not continue to come off. In the alternative an additional $50,000 payment for the handles would be acceptable and they will become Mr. Epsteins issue; 2. The concealed hardware inside the swinging bookcases at the entry doors is falling off. The screws are too short for proper attachment to the wood. The keys that operate the locks are breaking and the escutcheons at the keyholes are missing. 3. The hinges on the swinging bookcase doors are misaligned and require corrective action. 4. The connecting hardware at the sliding panels at the picture window is loose or broken S. The wood filler pieces at the perforated frames around the sliding panels at windows require open joints to be filled so daylight does not shine through. 6. Open joints in the woodwork, especially at the cornice allow the cove lighting to shine through and must be filled. 7. Numerous carved pieces of wood at the cornice top edge are broken off and require repair and replacement. 8. Several cabinet doors require adjustment to fit evenly and square within their frames. 9. The perforated panels at the tilt top desk panels are consistently unfinished on the right side. The perforations on the left side are shaped like flower petals, while the perforations on the right are simply drilled. The photo of the Escorial library and the shop drawings indicate the perforated panels are to match on each side. 10. The exterior sides (the side facing out and viewable from the exterior when looking into the windows) of the sliding panels are completely unfinished and look like mere plywood. They are incomplete and need to be completed. fl11 1.41141014 ** ** 1.114.1 14.1 11 1.41.4.114.1 14.1 11 1.4 **** At ** ** The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to and destroy this communication and all copies thereof, including all attachments. 24 EAST 64TH STREET NEW YORK. NY 10011 212 935 6537 fax ITT 935 6538 infr@facellipmeling.com WWW.FANCELLI-PANTLING.COM STJ - Resolution Agreement - Oct 2010 Page 10 / 22 EFTA00721955 PANELING Pictures document = see attachment Item 1 from September 8 List: Page 1 to 4 Decorative Brass hardware Loose or broken Item 2 from September 8 List: Page 5- to 14 Concealed hardware at swinging bookcase is falling off Breaking keys missing escutcheons Item 3 from September 8 List: Page 15 to 18 included Hinges on swinging bookcases are misaligned Item 4 from September 8 List: Page 19 to 20 Sliding panel rail broken Item 5 from September 8 List: Page 21 to 22 Light in the carved shutters frames Item 6 from September 8 List: Page 23 to 37 Open joints in woodwork Light come through at cornice Item 7 from September 8 List: Page 38 to 40 Cornice missing elements Item 8 from September 8 List: Page 41 - to 46 Alignment of cabinet doors Item 9 from September 8 List: Perforations o No pictures Columns Seams/Cracks/Words Carved In Columns: Page 47 to 50 CARVER SIGNATURE NOT in the PUNCH LIST Page 51 24 EAST 64TH NEW YORK. NY 10021 935 6537 fax III 935 651E infr@fancellitentliffig.com IIWW.FANCULI-PANCLING.COM Sll - Resolution Agreement - Oct 2010 Page 11 / 22 EFTA00721956 e711/ZCee PAN PILING Date: September 24, 2009 Invoice 1096 Molyneux Studio 29 East 69th Street New York, NY 10021 (212) 628-0097 Dear Pascal and Jeremy: Job Reference: LSJ Expenses With Receipts Please find below Invoice 1096 with justification receipts of the travel expenses for the period May 18 - June 24, 2009 Receipts reference is indicated in the Item# column Copy of receipts are to be found in PDF attachments Thank you to let me know if you need further assistance Best regards, Christian Barthod LS) Installation Expenses From May 18th to To June 21g, 2009 Item Nature Description Amount $ ARCarredo SAS di Francesco Guerazzi May 18 - June 21 2009 Invoice ArcArredo -2009-Sep-04 Airfare 4 installers. Italy — St. Thomas [€ 5.264.24=] $ 7,451.00 Food Meals, Groceries and Linens $ 2,661.25 Transportation Car Rental, gas $ 2,134.00 Transportation Tip Driver $120.00 Jean Pierre Fanelli June 17 - 24, 2009 Teresa Travel Airfare Paris - USVI $1,173.00 June 17 — 21, 2009 Receipts as pdf Food meals $454.00 David Collins 6E-1 Estate Nazareth May 18th - June 21st Invoice #51409 House Rental St. Thomas, USVI 00802 $4,625.00 TOTAL DUE USD $18,618.00 Note: C= USD 1.41541 at June 1 09 24 EAST 64TH NEW YORK. NY 10021 III 935 6537 fax III 935 6538 infr@fewellitantliffig.com WWW.FANCZILI-PANCL1NOCOM STJ - Resolution Agreement - Oct 2010 Page 12 / 22 EFTA00721957 e711/ZCee PANELING September 30, 2009 INVOICE 1098 Molyneux Studio 29, East 69th Street New York, NY 10021 (212) 628-0097 Attn: Auralien Gallet: Estimate Work order Job Reference: 1065 - D Jig email 05/09/2009 8321 St. James complements Article Description U Qty Amount EUROS Facing Panels for vestibule doors adjusted to existing embrasure. Decorative Hardware Not Included Woodwork complements and fillers to conceal gaps between woodwork and building construction discrepancies. see report #10-A pictures Large bay window; 2 windows; 2 entrance doors embrasures 1 Cabinet door replacement with Bamboo grill doors Decorative Hardware Not Included 2 Color staining and finish of the above 1 On site installation 1 Total production 040,000.00 TRAVEL & LIVING EXPENSES Estimated price. Le remboursement des frals de voyage et de sejour engages pour le personnel devant se deplacer dans la limite du budget de 13000€ que nous avions calcul€ ; Refund of travel expenses and sojourn - food accommodation will be charged AT COST at the end of stay - estimated 013,000.00 TOTAL 040,000.00 Mr. Molyneux requested to consider the options to Block shutters' cut out to create absolute darkness in the room. Work to be performed & to schedule: o Wood work complement - upon approval o Color finish touch up Color touch up - and wood work complement can be done after the completion of the large window bay and parquet floor. 24 EAST 64TH NEW YORK. NY 10021 TIT 935 6537 fax III 935 653E isfr@fericellitentling.com WWWFASCULI PANCL1NG.COM - Resolution Agreement - Oct 2010 Page 13 / 22 EFTA00721958 e.9il/Zeet PAN ELING As per Jean Pierre Fancelli Email: From: Jean Pierre PORTABLES [mailto: Sent: Sat 05/09/2009 00:52 To: Aurelien Gallet Subject: LS] J Cher Aurellen , pour faire suite à notre conversation Je propose à Mr Molyneux un forfait de 40 000€ pour les travaux décrits dans notre dernier devis ; Le remboursement des frais de voyage et de séjour engagés pour le personnel devant se déplacer dans la limite du budget de 13000€ que nous avions calculé ; J'espère que cette proposition sen agréée par Mr Molyneux , restant à votre disposition, veuillez accepter mes meilleures salutations lean Pierre Fancelli 24 EAST 64TH NEW YORK. NY 10021 III 935 6537 fax III 935 6538 infreenrelli•peneling.rom WA.FANCEILI-PANCLING.COM - Resolution Agreement - Oct 2010 Page 14 / 22 EFTA00721959 2 4 5il/Zeet PANELING Date: September 27, 2010 Estimate 201' Work order Waiting Molyneux Studio 750 Lexington Avenue New York, NY 10022 (212) 628-0097 VIA EMAIL Juan Pablo Molyneux QtY Job Reference: St. James Office Description Motifs marquetés sur portes dérobées des bibliotheques, volets coulissants aux deux extrémités de l'office, Volets Coulissant sur grande baie Suivant dessins proposé I7 Septembre 2010 Approvél7 par Molyneux Studio confirmation de Cesar 20 septembre 2010 Etude des motifs marquetés réalisation de dessins pour répartition des essences de bois Façades des portes dérobées et volets coulissants aux deux extrémités de l'office coté office et contre face à motifs de damiers en marqueterie en chêne avec fil 8 de bois alternés , filet noir de 2mm ,plate bande de 5 cm au pourtour de la composition avec filet noir et filet de bois clair de 4mm. Dim 1739x900 Volets Coulissant sur grande baie face office et contre face même travail à damiers en marquèterie de 1964x1742 avec filet et plate bande 2 volets latéraux face office et contre face même travail à damiers en marqueterie de 1964x749 avec filet et plate bande Amount 1,200.00 E 14,000.00 € 6,840.00 E 6,600.00 E Marquêterie, 96 motifs marins en marqueterie suivant dessin repartis sur les faces à damiers 10,272.00 € mise en caisse Transport a St. Thomas Livraison sur site a St. James a la charge du client Pose et finition sur place TOTAL SOLUTION DE BASE Option Moins Value -5,500.00 € Variante en moins value : la face et contre face des volets de la baie vitrée marquetés à damiers, contre face des portes dérobées et volets coulissants aux deux extrémités de l'office, en chêne de fil , sans damiers marquetés TOTAL SOLUTION en Variante 42 492,00 E 24 EAST 64TH NEW YORK. NY 10021 In 935 6537 flw III 935 6538 infie@fenrelliteneling.com WA.FANCEILI-PANCLING.COM 1,380.00 € 8,900.00 € 47,992.00 € STJ - Resolution Agreement - Oct 2010 Page 15 / 22 EFTA00721960 PANELING Message transféré -------- De : <cesar@molyneuxstudio.fr> Date : 20 septembre 2010 10:40 Objet : Little st james : can ierre fancelli M Fancelli, >, JPM Mobile M Molyneux me demande de vous dire que M Epstein a aime et approuve le sketch des voles. M Epstein a souligne qu'il vous attend avec votre equipe le 23 sur Pile. Merci de nous confirmer votre presence a la date du 23. Merci Cesar Ce message a été envoyé depuis un terminal BlackBerry de Bouygues Telecom 24 EAST 64TH NEW YORK. NY 10021 III 935 6537 fax III 935 6538 isfreenrelli•parteling.rom ennr.rAnctiu PANELING.CON - Resolution Agreement - Oct 2010 Page 16 / 22 EFTA00721961 e.9il/Zeet PAN (LING , 6c.". ce kc ererortiec; \ r es _e_O3,„(_ _ . saa.` Site Conditions : accord sur présent devis, suivant sketsch approuvé. Acompte de 50 % a l'acompte Exécution 4 semaines à partir de la commande Transport par avion en caisse bois 24 EArr 64TH NEW YORK. NY 10021 In 935 6537 far III 935 6538 isfrenrelliteneling.com WWW.FANCEILI PANELING.COM ST) - Resolution Agreement - Oct 2010 Page 17 / 22 EFTA00721962 gil/Zeet PANELING Date: October 26, 2010 a Estimate 2013 Work order Waiting Molyneux Studio St. James Office 750 Lexington Avenue NEW COLOR — New York, NY 10022 Job PHASE ONE: (212) 628-0097 Reference: SAMPLE DEFINITION VIA EMAIL Juan Pablo Molyneux As per Designated Punch List & Proposed New Work NEW WORK: NEW COLOR STAINING PHASE ONE: SAMPLE DEFINITION Item Description Terms of payment Currenc New Color - Sample Definition Required: Molyneux Studio Designer on site for approval and signature with Finisher, for process and color approval 1 person 2 days €950 / per Day per Person 100% on order €1,900.00 Supervision from Fancelli for approval and signature 1 person 2 days €1.200.00 / per Day per Person 100% on order €2,400.00 Crew - Expenses 2 finisher persons 2 days $380.00 / per Day per Person 100% on order S1,520.00* Air Fare $ 1,900.00 per Person 100% on order S3,800.00* Estimated TOTAL C €4,300.00 Estimated TOTAL $ $5,320.00 24 EAST 64TH NEW YORK. NY 10021 III 935 6537 fa In 935 653E infr@fancellitarling.com IITIVW.FANCELU-PANCLING.COM * Note Expenses are estimated for a Low Season Basis ST1 - Resolution Agreement - Oct 2010 Page 18 / 22 EFTA00721963 PANELING Date: October 26, 2010 Estimate 2014 Work order Waiting Molyneux Studio 750 Lexington Avenue St. James Office New York, NY 10022 Job NEW COLOR — (212) 628-0097 Reference: PHASE TWO: Labor ESTIMATION VIA EMAIL Juan Pablo Molyneux NEW COLOR STAINING PHASE Two: PROJECTED LABOR STAINING Following the definition of the staining sample PHASE ONE as defined in Estimate 2013, we will be able to assess the amount of work necessary to execute the finish expected. The intervention is also likely to require some de-installation of cornices and columns Please find below an "estimated" price range / bracket NEW COLOR — ESTIMATED LABOR Terms of payment Amount Range FROM TO NEW COLOR - EXPENSES NEW COLOR LABOR Projected New Color - Staining Labor €950 / per Day per Person 4 persons 20 to 24 days 80 % on order 20% on completion €19,000.00 €22,800.00 Projected New Color - Carpenter Labor €950 / per Day per Person 2 persons 7 days to 21 days 80% on order 20% on completion €13,300.00 €39,900.00 NEW COLOR - PROJECTED EXPENSES New Color - Expenses Staining Crew $380.00 / per Day per Person 4 persons 20 to 24 days 100% on order $30,400.00 $36,480.00 Staining Crew Flights $1,900.00 / per Person 4 persons 100% on order $7,600.00 $7,600.00 New Color - Expenses Carpenter Crew $380.00 / per Day per Person 2 persons 7 days to 21 days 100% on order $5,320.00 $15,960.00 Carpenter Crew Flights $1,900.00 / per Person 2 persons *air fare can be shared with color staining intervention for carpenters 100% on order *$3,800.00 *$3,800.00 14 EAST 64TH NEW YORK. NY 10021 RIR 935 6537 fax 212 915 651E infr@fincellitentling.rom www.FANCEILI-PANCIANG.COM STJ - Resolution Agreement - Oct 2010 Page 19 / 22 EFTA00721964 PANELING NEW COLOR - SUPERVISION & APPROVAL New Color - Supervision from Fancelli for approval and signature 1 person 2 days €1.200.00 / per Day per Person 100% on order €2,400.00 €2,400.00 Air Fare $ 1,900.00 per Person 100% on order $1,900.00 $1,900.00 * Note Expenses are estimated for a Low Season Basis 24 EAST 64TH NEW YORK. NY 10021 TIT 935 6537 fox III 935 653E isfrefericellitentling.com WWW.FANCLLU PANCLING.COM ST1 - Resolution Agreement - Oct 2010 Page 20 / 22 EFTA00721965 PANELING DESK FLAP DOOR The drilled hole left side does not same than the right side. To solve the problem we have to replace all drilled panels with new panels all equal. We have to cut the back side of the door that holds the drilled panel (using a rotor), then replace that panel and then glue a new oak frame around the panel 24 EAST RATH NEW YORK. NY 10021 " 2 935 6537 fax 2". 935 653E irtfr@ ancelliteneling.rom IITIVCSANCELLI PANZIANG.COM ST] - Resolution Agreement - Oct 2010 Page 21 / 22 EFTA00721966 PANELING END - • a SIDE TO CUT WITH A ROTOR AND THEN TO GLUE A NEW FRAME 24 EAST 64TH STREET NEW YORK. NY 10021 212 935 6537 fax III 935 653E infrefericellipentliffig.com enratuscuu PANCLING.COM ST] - Resolution Agreement - Oct 2010 Page 22 / 22 EFTA00721967

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00721946.pdf
File Size 1514.5 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 31,281 characters
Indexed 2026-02-12T13:51:39.400973
Ask the Files