LSJ CONSTRUCTION
Subcontractor Payout
Project:
Mechanical Building #1002
Trade:
Plumbing, Fire Protection
Subcontractor Abbott & Lineham Mechanical
Insurance ex
nvoice #
Phase #
Requisition #02
15-400, 15-500
Original Contract Sum:
Change Orders Submitted & Approved:
New Change Orders:
Total Work Contracted to Date:
Total Work Completed to Date:
Less Retainage:
Total Payments Made to Date:
Total Current Payment Due:
Balance to Finish including Retainage:
Sales Tax Liability:
a. Subcontractor/Supplier is liable, explaii
October 19, 2010
Requisition #02
iration: March 26. 2011
J78%
install only / tax
included in contract
b. Non-resident Subcontractor/Supplier Bond Applicable:
c. Use Tax to be paid by our company:
d. Shipping
Total Outlays for this contract incl. Sales or Use Tax:
JEE approval attached
YES
NO
X
Submitted Bill
Signed:
Date: October 19, 2010
Approved by: Emad
Signed:
Date:
a Ito
$287,100.00
$0.00
$0.00
$287,100.00
$224,833.50
$11,241.68
$71,912.15 /
it
$141,679.68 t/OF.
$73,508.18
None
$224,833.50
YES
X
Invoice Attached
NO
Approved by: Gary
Signed:
Date: October 19, 2010
Approved by:
Signed:
Date:
EFTA00722183
Emad Hanna
From:
Monique Harry [
Sent:
Wednesday, Oc ober 20, 2010 12.41 PM
To:
Emad Hanna
Subject:
Abbott and Lineham Mechanical
Attachments:
Abbott Req 1 1002 Fuel Piping.pdh Abbott Plumbing 1002 Req 2.pdf
Emad,
Attached for payment (2) Abbott and Lineham Mechanincal Payouts $164,289.68.
Plumbing, Fire Protection
1002 - 15-400 - $14,725.00 vC.
1002 - 15-500 - $126,954.68 I,-
Fire Piping
1002 - 15-310 -$22,610.00
Monique
EFTA00722184
I.SJ CONSTRUCTION
Protect Mechanical Building #1002
ubcontraclor - Full logal name: Abbott R I inellam Mechanical
Phase # 15-400. I 5-500
Trade: Plumbing. Fire Protection
Invoice N. Requisition #02
Dabs Revised October 19. 20W
Insurance expiration: 26-Mar-t I
Payment
Partial
Final
X
Invoice/RG.O
Date
CK)
Antoine
Iii:iairinge
Due
Paid
Date Paid Clash!!
Contract Amount
03/15/1
787 in
COtll
C0112
CO/t3
0014
CO#5
912.151 7
-
Requisition tit
05/26/10 Fins Protection
75.897.00
3.11,
71.912.15
0.00
Requisition #2
10/19/10 File Protection
149136.50
II 679.68
mi 07968
Requisition 03
0.00
Requisition #4
0.00
Requisition #5
Requisition #6
Requisition it/
Rexpesition att
_
Requisition #9
0.00
22-183350
11.241 68
213.59183
/1.917 is
I41.67858j
Total
Contract Amount
Phase
Contract
Plumbing. Fire Piotechon
28/.100 00
CO#1
DescriEUOn
CON2
Desaletkin
CO#3
I Mscriplion
CO#4
I inscription
CONS
Description
Contracted to Date
I 28/.10000
Balance of C.ontract wiRetainage
73.508.18
EFTA00722185
Abbott & Lineham Mechanical
6501 Red Hook Plaza STE 201
St. Thomas, VI 00802
Tel:
Fax:
Invoice
10/19/10
LS1, LLC
Attn: William Rowles
6100 Red Hook Quarter B-3
St. Thomas, VI 00802
Wet Sprinkler System —Mechanical Building Requisition #2
Quote: $161,600.00
Contract #1002 Agreement #1
'Cost Code: 15-500
Previously billed: Req. #1
$25,000.00
Pump and controls
$25,000.00
Current due:
Req. #2
$79,360.00
Balance on main pump and controls
Materials on site 70%
Piping labor @ 20%
Profit and overhead
$35,000.00
$21,000.00
$ 8,000.00
$15,360.00
Current due less 5% retainage ($3,968.00)
$75,392.00
EFTA00722186
Abbott & Lineham Mechanical
6501 Red Hook Plaza STE 201
St. Thomas, VI 00802
Tel:
Fax:
Invoice
10/19/10
LSJ, LLC
Attn: William Rowles
6100 Red Hook Quarter B-3
St. Thomas, VI 00802
Water Pumps—Mechanical Building
Requisition #1
(
Quote:
$134,920.00
Contract #1002 Agreement #1
Cost Code: 15-400
Current due:
$15,500.00
50% deposit on pump
Current due less 5% retainage ($775.00)
$14,725.00
EFTA00722187
Abbott & Lineham Mechanical
6501 Red Hook Plaza STE 201
St. Thomas, VI 00802
Tel:
Fax:
Invoice
10/19/10
LSJ, LLC
Attn: William Rowles
6100 Red Hook Quarter 6-3
St. Thomas, VI 00802
Foam system for oil storage building
Requisition #2
Quote:
$127,000.00
Contract #1002 Agreement #1
Cost Code: 15-500
Previously billed: Req. #1
$50,697.00
Design of system
Deposit on foam system
Pipe and fittings on site
$2,500.00
$28,197.00
$20,000.00
Current due:
Req. #2
Balance on foam equip
Piping @ 75%
Profit & overhead @25%
$28,197.00
$21,079.50
$ 5,000.00
Current due less 5% retainage ($2,713.8a)
'
<(Z
/77i/71-
/
cY"
7Pi
/Ma
$54,276.50
$51,562.70
EFTA00722188
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00722183.pdf |
| File Size | 597.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 4,481 characters |
| Indexed | 2026-02-12T13:51:45.939974 |