Maguire Group Inc.
Architects / Engineers / Planners
33 Commercial Street
Foxbor
Phone•
Fax:
E-Mail:
November 3, 2008
Mr. Darren Indyke
Little St. James LLC
St. Thomas, USVI
C/o NY Strategy Group
The Villard House
457 Madison Ave., 4d' Fl.
New York, NY 10022
Jeffrey M. McCormick, PE
Project Manager
RE:
Engineering /Architectural Services — Revised Work Order No. 13:
Storm Water Pollution Prevention Nan (SWPPP), Drainage
Improvements and CZM drawings
Dear Mr. Indyke:
Maguire Group Inc. is pleased to present this proposal for revised Work Order No. 13
under our Master Agreement to provide engineering services for Little St. James Island.
This Work Order is based on the general scope of services, terms, and conditions
described in the Abbreviated Standard Form of Agreement Between Owner and Architect
herein known as the Master Agreement, dated February I, 2007. In general, the services
proposed in Work Order No. 13 include site/civil engineering design to compile two
SWPPP's (Storm Water Pollution Prevention Plans), drainage improvement plans and an
island-wide CZM drawing package.
Background and Scope
SWPPP - The SWPPP reviews the nature of the construction activities and overall project
size and impacts. It is essentially a report to reinforce the controls needed for storm water
management. An overall hydrologic impact assessment, storm water calculations and best
management practices for construction activities will be compiled for submission to
DPNR. The SWPPP is required for sites disturbing over one acre of land as stated in
DPNR's regulations:
"Construction activities disturbing less than one (1) acre of total land area but is part of a
larger common plan of development or sale that will ultimately disturb equal to or greater
than one (I) acre."
Thus far, the Little St. James construction activity permit applications submitted to the
DPNR's CZM Department include the office pavilion, mechanical building and existing
Winner of Two Presidential Awards for Design Excellence
EFTA00722335
Little St. James LLC
Mr. Darren Indyke
Page 2 of 4
residence. Building permits have been issued for both the office and mechanical building.
However, DPNR now requires that a SWPPP be submitted for the above parameters on all
new construction prior to issuing building permits. Therefore, we will need to complete
two phases of SWPPP plans. Phase I shall include the existing residence additions and
alterations which will be submitted as soon as possible. Phase 2 shall include existing
and proposed island wide construction activities, primarily parcels A and B. The phase 2
plan will incorporate the program for all roads, drainage improvements, buildings, and
utilities, etc. that have been or will be installed. This SWPPP will be filed with the island
wide CZM application. The site/civil engineering required to provide the SWPPP
includes the following;
•
Review existing hydrologic analysis completed by Bill McComb.
•
Provide hydrologic calculations for the pre- and post-construction condition
utilizing the latest existing residence compound drawings for phase 1 and revised
Moseley survey for phase 2.
•
Provide the existing and proposed whole island hydrologic watershed and drainage
pattern drawings with drainage subareas for phases 1 and 2.
•
Fill out SWPPP forms and compile all pertinent information, maps, soils, BMP
data, drainage plans, descriptions, etc. required for both phase 1 and 2 applications.
Submit ten copies of each to John Amerling of Lafayette Contractors for filing
with the DPNR. Provide copies to appropriate oversight staff. Phase I work will
commence immediately after execution of this work order Phase 2 will commence
after program concurrence by owner for parcel A & B CZM drawings.
Drainage Improvement Plans - Drawings will be developed to address drainage
problems causing erosion at specific locations on the island. This will encompass various
drainage structures to collect, convey and discharge storm water in an efficient manner
that will reduce erosion. Collection structures will be detailed and located on the
drawings and sized based on the contributing subarea watershed. Structures will be
designed to accommodate a 10 -year storm event. To minimize visual impacts, structures
will be built into exiting walls and will allow for more frequent discharge points.
Drainage swales lined with rip rap will be used in more remote areas or where topography
allows. Sedimentation basins will be utilized where practical. All structures will be
reviewed with the owner's representative for approval. These drainage improvements will
be noted in the SWPPP and will be included in the CZM drawing package. The site/civil
engineering required to provide the drainage improvement drawings include the
following;
•
Develop approximately six construction drawings showing location and details of
drainage improvements (1 overall layout drawing, 4 drainage improvement
drawings with 20-scale widows on specific areas and 2 detail sheets).
Winner of Two Presidential Awards for Design Excellence
EFTA00722336
Little St. James LLC
Mr. Darren Indyke
Page 3 of 4
CZM Drawings —The CZM drawings will incorporate all of the significant, island wide
construction done to date including "temporary" buildings, roads, road surfacing, drainage
improvements and other structures. Brian Moseley & Associates is currently being
engaged to update the survey base plan to include all of theses features. The drawings
will also include all proposed work such as utility duct banks, road resurfacing, etc. that
may currently be envisioned. These drawings are exclusive of the previously permitted
activities on parcel C and essentially highlight the balance of remaining construction
activities on the island as currently perceived. The site/civil engineering required to
provide the CZM drawings include the following;
• Develop approximately five permit drawings showing existing and new site
features and proposed improvements. This will include site plans (structures,
excavation activities, dirt roads, paved roads, drainage, erosion control plans, and
details.
Deliverables
•
SWPPP (phase I) Existing residence additions and alterations
•
SWPPP (phase 2) All existing/proposed island wide construction.
•
Drainage improvement construction plans.
•
CZM drawings for island wide construction activities
Budget
We propose to engage in the above-defined design services on a not-to-exceed budget
based on the 2008 professional billing rates attached, plus reimbursable expenses.
Reimbursable expense budget is for planning purposes only and could be exceeded if
additional copies mailing etc. occur. Invoices will be submitted monthly based upon the
hours and expenses charged directly to the project in the preceding month. Please refer to
the attached spread sheet for man hour distribution.
Work Order No. 13 budgets as follows:
We suggest the establishment of
SWPPP Phase 1 (Ex. Residence)
$10,840.00
SWPPP Phase 2 ( Island-wide)
$13,680.00
Drainage Improvements
$23,480.00
CZM Drawings ( Island-wide)
$20,290.00
Reimbursable Expenses
$1,000.00
Total:
$69,290.00
Winner of Two Presidential Awards for Design Excellence
EFTA00722337
Little St. James LLC
Mr. Darren Indyke
Page 4 of 4
Please feel free to call me directly if you have any questions. We look forward to
undertaking this important and interesting project.
Very truly yours,
MAGUIRE GROUP, INC.
a
AA /4
Jeffrey M. McCormick, PE
Project Manager — Land Development
Approved and accepted this
day of
2008
Darren Indyke — for Little St. James, LLC
cc: Thomas Hevner -MGI, Eric Douglas- MGI, Files
Winner of Two Presidential Awards for Design Excellence
EFTA00722338
Document Preview
Extracted Information
Locations
Document Details
| Filename | EFTA00722335.pdf |
| File Size | 259.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 7,831 characters |
| Indexed | 2026-02-12T13:51:51.402674 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.