Back to Results

EFTA00722406.pdf

Source: DOJ_DS9  •  other  •  Size: 199.6 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

Maguire Group Inc. Architects / Engineers / Planners 33 Commercial Street Foxbor Ph • Fax: E-Mail: September 29, 2009 Jeffrey M. McCormick, PE Project Manager Mr. Gary Kerney -Representing LSJ LLC (master agreement "owner") Landmark Land Co. 2817 Crain Hwy Upper Marlboro MD 20774 Procured through HBRK Associates Inc. PO Box 400. New York, NY 10150 RE: Engineering /Architectural Services — Work Order No. 17. Revisions to Mechanical Building Dear Mr. Kerney: Maguire Group Inc. (Maguire) is pleased to present this proposal for Work Order No. 17 under our Master Agreement to provide architectural and engineering services for Little St. James Island. This Work Order is based on the general scope of services, terms, and conditions described in the Abbreviated Standard Form of Agreement Between Owner ( LSJ., LLC ) and Architect (Maguire Group) herein known as the Master Agreement, dated February I, 2007. The following revisions shall apply to the master agreement: I. Maguire Group Inc. address shall be revised to 33 Commercial Street, Foxborough MA 02035 2. Molyneux Studio or any reference to Molyneux shall be replaced by Owner's interior designer or representative. 3. Paragraph 1.1.1 "Owners Design Team" spokesperson shall be Gary Kerney in place of Douglas Schoettle. In general, the services proposed in Work Order No. 17 includes architectural design and civil, structural, mechanical, electrical, and plumbing engineering for the Revisions to the Mechanical Building design scoped with Gary Kerney, September 11, 2009. Services will be provided for design development and construction documents described in Article 2 - Scope of Architect's Basic Services of the Master Agreement. A more site specific description of the project scope and services to be provided is as follows: Scope The second phase of the mechanical building construction will include building the structure as essentially designed between columns 1 through 7, deleting the construction between columns 7 through 11 and building columns Il through 14 are to become free standing. The floor plan program between columns 5 through 7 will now be shell Winner of Two Presidential Awards for Design Excellence EFTA00722406 Little St. James LLC Mr. Gary Kerney Page 2 of 4 construction only, no interior offices/bathrooms etc. Water production to be reduced to approximately 100,000 gallons per day utilizing reverse osmosis units design of which including specific mom requirements to be programmed by others, but implemented into the floor plan design. TSG out of Tampa Dean Bedford contact was providing the water production previously. Architecture: Maguire shall remain "Architect of Record" assuming full coordination and technical responsibilities for implementation of the interior and exterior architectural design concepts. Maguire will revise the construction documents accordingly. The program for columns 5 thru 7 to be structural shell only construction. Site/Civil: Site drawing will be revised to show new building and utility connections as well as grading to match the new building layout. Structural: The Structural drawings and details will be revised accordingly to implement the new program. Mechanical, Electrical, Plumbing: Existing designs will be revised according to the new program. Technical Specification and Submittals: Technical specifications are SI format and MASTERSPEC® will be revised as necessary for the revisions. Construction Administration: This will include shop drawing review, request for information responses, construction sketches and any site investigations or inspections deemed necessary. Deliverables We anticipate one submission for owner review and comment prior to construction sketches. Coordination meetings will be held by teleconference as needed. Fee The scope of services is as anticipated in the Master Agreement and as generally described above. We propose to engage in the design services on an hourly basis, utilizing the hourly billing rates attached plus reimbursable expenses. Reimbursable expenses shall consist of mail, printing, travel, lodging etc.. Invoices will be submitted monthly based upon the hours and expenses charged directly to the project in the proceeding month. For financial planning purposes, we suggest the establishment of Work Order No. 17 budgets as follows: Architecture $7,000 Structural $10,000 Mech., Elect, Plumbing $16,000 Site/Civil $5,000 Const. Administration $15,000.00 Reimbursable Expenses $500.00 Total: $53,500.00 Winner of Two Presidential Awards for Design Excellence EFTA00722407 Little St. James LLC Mr. Gary Kerney Page 3 of 4 This budget is open ended and is not a "NOT-TO-EXCEED BUDGET" as past history with LSJ projects dictates multiple scope changes are expected throughout design and construction. Maguire has and will continue to be diligent and responsive to the clients needs. Your signature and receipt of a $10,000 retainer will be considered notice to proceed. Please feel free to call me if you have any questions. We look forward to working with the LSJ, Lafayette and HBRK team once again. Very truly yours, MAGUIRE GROUP, INC. ./104 / 1-4_ Jeffrey M. McCormick, PE Project Manager — Land Development Approved and accepted this day of 2009 Gary Kerney— for Little St. James, LLC cc: Darren Indyke HBRK, Thomas Hevner -MGI, Eric Douglas- MGI, Files Winner of Two Presidential Awards for Design Excellence EFTA00722408

Document Preview

Document Details

Filename EFTA00722406.pdf
File Size 199.6 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 5,542 characters
Indexed 2026-02-12T13:51:52.189674

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files