Andrew Levy- Design Assistant
19 Pinecliff Road
Chanoarma, NY. 10514
Hasan-Uddin Khan
143 Concord Avenue
Lexington, Massachusetts 02421, USA
Project Title: L.S.I
Time Sheet #3
8/1/09 - 8/31/09
Week 26
Date
Description
Hours
8/3/09
Revised Plan with north elevation
4
8/4/09
Revised Plan, changing room
8
8/5/09
Revised Plan, Bedroom Circulation
8
8/6/09
Revised Plan and Section of hammam
8
8/7/09
Revised Plan and Section of hammam
5
Weekly Total
33
Week 27
Date
Description
Hours
8/10/09
Update all drawings
4
4/11/09
Update all drawings
8
4/12/09
Complete drawings set and post to FTP Site
6
8/14/09
Meeting (3h)
3
Weekly Total
21
EFTA00724694
Week 28
Dote
Description
Hours
8/17/09
Exterior Model
8
8/18/09
Exterior Rendering with elevations
8
8/19/09
Exterior Renderings with elevations
5
8/20/09
Interior model
8
8/21/09
(Meeting 3h) Interior renderings
8
Weekly Total
37
Week 29
Date
Description
Hours
8/24/09
Meeting (2h) Revised Schematic Package
8
8/25/09
Revised Schematic Package
8
8/26/09
Revised Schematic Package
8
8/27/09
Revised Schematic Package
8
8/28/09
Meeting (2h) Revised Schematic Package
8
Weekly Total
40
Week 30
Date
Description
Hours
8/29/09
Revised Schematic Package
8
8/31/09
Meeting (1) Print and Mail Package
4
Weekly Total
11
Total Hours
143
EFTA00724695
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00724694.pdf |
| File Size | 51.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,392 characters |
| Indexed | 2026-02-12T13:52:13.979708 |