Back to Results

EFTA00724696.pdf

Source: DOJ_DS9  •  Size: 44.6 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

Andrew Levy- Design Assistant 19 Pinecliff Road Chanoarma, NY. 10514 Hasan-Uddin Khan 143 Concord Avenue Lexington, Massachusetts 02421, USA Project Title: LSJ Time Sheet #9 9/1/09 - 9/30/09 Week 31 Dote Description Hours 9/2/09 Format Upload package to FTP site 2 9/3/09 Update sections, Raw perspectives for SC 6 9/5/09 Update plan with new landscaping scheme 5 Week 32 Date Weekly Total 13 Description Hours 9/8/09 Meeting (2h) Review west and south terrace and landscaping 6 9/9/09 West elevation and Model 8 9/10/09 West elevation renderings 8 9/11/09 Meeting (2h) Review West elevation drawings 4 Weekly Total 26 EFTA00724696 Week 33 Date Description Hours 9/14/09 South elevation and Model 8 9/15/09 South Elevation Renderings 4 9/16/09 South West Corner Model and rendering 8 9/18/09 Orientation Diagrams 3 Weekly Total 23 Week 35 Date Description Hours 9/28/09 Perspectives for orientation 4 9/29/09 Meeting (1h) review west and Entrance changes 2 Weekly Total 6 Total Hours 68 EFTA00724697

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00724696.pdf
File Size 44.6 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,074 characters
Indexed 2026-02-12T13:52:14.001478
Ask the Files