EFTA00724703.pdf
PDF Source (No Download)
Extracted Text (OCR)
Andrew Levy- Design Assistant
19 Pinecliff Road
Chappaqua, NY. 10514
Hasan-Uddin Khan
143 Concord Avenue
Lexington, Massachusetts 02421, USA
Project Title: LSJ
Time Sheet #3
3/3/09 - 3/25/09
Week 8
Date
Description
Hours
3/3/09
Meeting, create scheme 11 plan
4
3/4/09
Meeting, scheme 11 massing, roof plan
5
3/5/09
finish scheme, Send, prepare drawing sets,
6
3/6/09-
3/9/09
Site analysis on location
8
Weekly Total
23
Week 9
Date
Description
Hours
3/10/09
Meeting, gather info, organize site photos
5
3/11/09
Meeting, begin scheme 12, Massing study with photos
6
3/12/09
Meeting with Bradford Associates + develop site scheme
8
3/13/09-
scheme 12 plan with site, scheme 12 level 0, new vestibules
8
Weekly Total
27
EFTA00724703
Week 10
Date
Description
Hours
3/16/O9
Create sections -NS, EW, study proportions, study grade levels 6
3/17/09
scheme 12 plan, (bedroom, changing, level 0)
6
3/18/09
scheme 12 Plan, site levels, view axis, look at entry
8
3/19/09
Massing model with new graded contours, adjust plan
8
3/20/09
Coordinate and finalize drawing, send email package
8
Weekly Total
36
Week 11
Date
Description
Hours
3/23/09
Meeting, new plan, new massing
8
3/24/09
Meeting w/ Bradford assoc.+ continue plan/massing
8
3/25/09
plan, massing, coordinate site plan with BA- Send
8
Weekly Total
24
Total Hours
110
EFTA00724704
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00724703.pdf |
| File Size | 54.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,411 characters |
| Indexed | 2026-02-12T13:52:14.044985 |