1. I found a contract dated 4-25-06 for engineering $140,000 plus $60,000 reimbursables to be signed by
Amerling
2. I found a draft architectural contract no #'s. According to meeting minutes Miller and Doug were
negoiating,but no documents ,Bill was not included in any meetings at this point but was copied with minutes
of some meetings
3.Jeffrey asked me to review Maguire costs.
4.1 assume you have copies of contracts and work orders that Doug and Charles executed .none are in
Monique's files. If so please forward them to me.
5.Rich can you send me the costs to date for Maguire on the office pavilion
Thanks
Gary
I of I
4/20/10 5:12 PM
EFTA00727217
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA00727217.pdf |
| File Size | 38.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 988 characters |
| Indexed | 2026-02-12T13:52:24.687984 |