EFTA00727977.pdf
PDF Source (No Download)
Extracted Text (OCR)
LSJ LLC
MAGUIRE GROUP, INC.
L
Old Billing Format
New Billing Format
Office
Master
Indoor
Utility
Locker
Office
Mechanical
Building
Library
CZM
Mechanical Environmental
Building
Baseline
LSJ
Master Bedroom &
Kitchen
Description
Pavilion
Planning
Pool
Upgrade
Room
Pavilion
Layout
Drawings
Drawings,
Study
Utilities
As Builts
Totals
Period Ending May 5. 2006
15.879.00
11,699.00
27,578.00
Includes retainer of lek in each category)
Period Ending May 5. 2006
32.751.09
17,248.91
50,000.00
Period Ending May 26. 2006
41.016.20
38,641.98
(retainer deacoon 0110k In office pavilion a 5k credit in once pavilion)
79,658.18
Period Ending Dec 20. 2006
42.501.42
24,692.69
78.954.56
6,170.00
9.842.00
(femme. deaction 0110k in office pavilion a 10k credit in office pavilion a 5.881.47 discount applied to pool)
162,160.67
Period Ending March 31. 2007
36.176.75
17,595.46
6.931.91 2,735.00
17.459.00
7.190.00
88,088.12
Period Ending April 27. 2007
(mechanical bldg previous billing o12.110 was not paid)
56.274.86
9.354.29
11.700.00
77,329.15
Period Ending May 25. 2007
59.983.08
8.188.12
14.242.09
82,413.29
Period Ending June 29. 2007
66.213.80
12.414.00
2.421.63
81,049.43
Period Ending July 27. 2007
35.340.00
30.319.00
8,496.00
74,155.00
Period Ending August 30.2007
14.245.78
9.164.00
34.947.73
8.566.00
7756.00
74,679.51
Period Ending September 28. 2007
44.899.99
41.870.98
6.332.00
15.640.00
108,742.97
Period Ending October 31, 2007
37.042.08
6.710.00
33.004.21
1.454.00
10.377.02
88,587.31
(6.216.00) over fixed contract price so we do not pay
Period Ending November 30. 2007
27.809.40
11.181.87
40.750.21
2.092.00
7.356.00
82,973.48
Period Ending December 31. 2007
17.514.70
81.296.96
(17.514.70)
Period Ending January 25, 2008
17.375.60
68.900.10
1.952.00
Period Ending February 29, 2008
12.444.00
4.936.00
24.818.89
454.00
1.464.00
(12.444.00)
Period Ending March 31. 2008
5.368.00
Period Ending April 28. 2008
1.218.72
2.440.00
Period Ending May 30. 2008
11.084.00
10.858.00
(11.084.00)
3.448.27
14757.34
239,287.88
Period May 31.2008 W October 24. 2008
2.808.58
26.733.80
14.041.79
12.265.00
55,849.17
Totals Paid
168.324.46
109,878.04 85.886.47
8,905.00
27.301.00
366,415.44
60.275.41
88.308.11
362.884 21
18.898.00
63.211 02
12.265.00
1.372 552.16
Project Numbers
17913
17914
18134
18135
18193
18321
18322
18328
18418
18437
18441
Na
a
a
h
Totals billed by Area
Office Pavilion
534.740 a
Master Planning
109.878 b
Total paid old format
400.295
Mechanical Building
423.160 c
LADrary
88.308 d
Total paid new format
972.257 j
Indoor Pool
85.886 e
Utility Upgrade
72.116
Locker Room
27.301 g
Master Bdrm & Kitchen / Env
31.163 h
Total billed by Maguire
1,372.552 e
EFTA00727977
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00727977.pdf |
| File Size | 76.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,877 characters |
| Indexed | 2026-02-12T13:52:42.991238 |