Back to Results

EFTA00735885.pdf

Source: DOJ_DS9  •  Size: 110.2 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Ken-Hao Hsu <1 To: Ga Kerne , Doug Schoettle Cc: Warwick Wicksman , Tom Sze , Bryan Oakes , Jeffrey Epstein <jeevacation@gmail.com> Subject: RE: LSJ Update Date: Fri, 06 Aug 2010 00:25:01 +0000 Attachments: LSJ VIEWS 20100805_LR.pdf Team, To follow up Warwick's email, please see attached revised images for your reference. These images reflect smaller screening room. Thanks, Ken-Hao Hsu LEED AP Associate Gensler 2500 Broadway Suite 300 Santa Monica CA 90404 From: Gary Kemey [mallto: Sent: Thursday, August 05, 2010 4:30 PM To: Warwick Wicksman; Doug Schoettle Cc: Tom Sze; Bryan Oakes; Ken-Hao Hsu; Jeffrey Epstein Subject: RE: LSJ Update Warwick These look good,we'll understand all the stairs in the screen complex better when we see the 3D renderings, as well the scale of the screening room .when the renderings are ready send to all. Thanks EFTA00735885 Gary From: Warwick Wicksman [mailto Sent: Thu 8/5/2010 6:17 PM To: Gary Kerney; Doug Schoettle Cc: Tom Sze; Bryan Oakes; Ken-Hao Hsu Subject: LS) Update Gary, Please review these draft sketches, and let me know if you need me to add any more info before you present them to Mr. Epstein this weekend! I have not sent them to him yet. Ken-Hao will be sending you the 3D views later today - as soon as they are ready. I have attached the plan views only. With these sketches, we have exhausted the re-design services approved Work Authorization 1. These are intended to be programmatic conceptual drawings. When we move forward with the next phase, we will refine the layouts, and get into the details of the design. Please note: The layouts are based upon previous Option 1, sent 7/28/10. We have revised the exterior stairs and circulation per our discussions. We have provided options for the Kitchen windows. We have revised the road, to reflect the corrected site plan we received yesterday, 8/4/10, with the relocated service road. Note, this did impact the previous layout a bit. I added the door at the north end of the east wall of the kitchen addition, per my conversation with Doug this morning. The two "partial site plans" attached reflect the two different screening room sizes. One has a 30' screen, per our original design. The other has a 25' screen, as I discussed with Gary. I recommend someone mock up the two sizes for Mr. Epstein's review, perhaps in the living room, to confirm the desired screen size. The screening room area is not completely laid out, as we need to dig into the design of that area in greater detail, once we set the location and screen size. If this layout is approved, we can prepare a new proposal to provide complete construction documents, based on this layout, including all of our consultants. If we need to make minor adjustments, we can accommodate that as we move forward. If we need to make major adjustments, I can prepare a new proposal for additional conceptual re-design services. EFTA00735886 Please call me or email me if you have any questions! Thanks, Warwick Warwick Wicksman, AIA Principal Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA EFTA00735887

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00735885.pdf
File Size 110.2 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,172 characters
Indexed 2026-02-12T13:54:36.534527
Ask the Files