EFTA00746116.pdf
PDF Source (No Download)
Extracted Text (OCR)
From: Jeevacation <jeevacationggmail.com>
To: Gary Kerney
Subject: Re: CZM
Date: Tue, 02 Mar 2010 16:01:54 +0000
Seems very high what do you think ad it merely schematics
Sent from my iPhone
On Mar 2, 2010, at 9:42 AM, "Gary Kerney"
Jeffrey
Attached is the CZM Dejongh proposal for $56,807.69 ,5 weeks
Ok to execute?
Gary
> wrote:
From:
Sent: Tue 3/2/2010 9:10 AM
To: Gary Kerney
Subject: RE: CZM
[mailto
Gary:
I have attached the Fee Proposal for preparing the 4 Schematic Design sets for the buildings you stated below.
Please call when you have reviewed it.
Robert deJongh
From: Gary Kerney [mailto
Sent: Monday, March 01, 2010 10:25 AM
To:
Subject: CZM
Donna
EFTA00746116
Do you have the proposal for the schematics for the 4 CZM exhibits
1.pool building
2.cottage
3.piana room
4.atv building
and a schedule
Thanks,Gary
<Fee Proposal Schematic Design CZM Submittal I March 2 2010.pdf>
EFTA00746117
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00746116.pdf |
| File Size | 45.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 934 characters |
| Indexed | 2026-02-12T13:56:58.520293 |