EFTA00746131.pdf
PDF Source (No Download)
Extracted Text (OCR)
From: "Gary Kerney"
To: "Jeffrey Epstein" <jeevacation@gmail.com>
Subject: FW: CZM
Date: Tue, 02 Mar 2010 17:30:39 +0000
Normal archectual fees for schematic design are 20% of the construction costs.
The proposed fees are below 20%
my estimates:
Dejongh
cottage — 2700 sq.ft. @ 50041,350,000 @ 20%427,000
$16,230.77
pool —1800 sq.ft. @ $1000 41,800,000 @ 20%=$36,000
$16,230.77
piano —1600sq.ft. @ $750 41,200,000 @20%424,000
$12,984.62
AN — 1050 sg.ft. @ $400=$420,000 @20=$8,400
$11,361.54
what little he's over on the ATV is covered by what he's under on the rest.
comments?
From: leevacation [mailto:jeevacation@gmall.com]
Sent: Tue 3/2/2010 11:01 AM
To: Gary Kerney
Subject: Re: CZM
Seems very high what do you think ad it merely schematics
Sent from my iPhone
On Mar 2, 2010, at 9:42 AM, "Gary Kerney"
Jeffrey
Attached is the CZM Dejongh proposal for $56,807.69 ,5 week
Ok to execute?
Gary
> wrote:
From:
[maitto
Sent: Tue 3/2/2010 9:10 AM
To: Gary Kerney
Subject: RE: CZM
Gary:
I have attached the Fee Proposal for preparing the 4 Schematic Design sets for the buildings you stated below.
Please call when you have reviewed it.
EFTA00746131
Robert deJongh
From: Gary Kerney [matIto
Sent: Monday, March 01, 2010 10:25 AM
To:
Subject: CZM
Donna
Do you have the proposal for the schematics for the 4 CZM exhibits
1.pool building
2.cottage
3.piano room
4.atv building
and a schedule
Thanks,Gary
<Fee Proposal Schematic Design CZM Submittal 1 March 2 2010.pdf>
EFTA00746132
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Document Details
| Filename | EFTA00746131.pdf |
| File Size | 65.5 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,528 characters |
| Indexed | 2026-02-12T13:56:58.691556 |