Back to Results

EFTA00748810.pdf

Source: DOJ_DS9  •  email/external  •  Size: 39.7 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

From: "Silvina Royston" <MI=IMM> To: "jeevacation®gmail.com" <jeevacation®gmail.com> Cc: MIE" <S, "Curtis Royston" Subject: Master Suite Expansion Date: Wed, 15 Apr 2009 12:20:07 +0000 Attachments: Photo_LJPG; Photo_2.JPG; Photo_3.JPG; Photo_4.JPG; Photo_5.JPG Jeffrey, We staked out the footprint of the Master Suite expansion. Please review attached photos. Orange sprayed line demarcates the perimeter of building. As you can see from Photo #2, the new back wall is only several feet from existing electrical lines and transformer equipment. This affects: Window at steam shower. We can: a. Keep window as in Pinto elevation and build a wall to conceal equipment. This alleyway, about 4' deep, can be planted and we can grow vines on the wall for greenery. b. Keep window but instead of clear glass install translucent glass for light, no view. c. Eliminate window. Let me know your thoughts. Regards, Silvina EFTA00748810

Document Preview

Document Details

Filename EFTA00748810.pdf
File Size 39.7 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 947 characters
Indexed 2026-02-12T13:57:39.583186

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files