EFTA00748810.pdf
Extracted Text (OCR)
From: "Silvina Royston" <MI=IMM>
To: "jeevacation®gmail.com" <jeevacation®gmail.com>
Cc:
MIE"
<S,
"Curtis Royston"
Subject: Master Suite Expansion
Date: Wed, 15 Apr 2009 12:20:07 +0000
Attachments: Photo_LJPG; Photo_2.JPG; Photo_3.JPG; Photo_4.JPG; Photo_5.JPG
Jeffrey,
We staked out the footprint of the Master Suite expansion.
Please review attached photos. Orange sprayed line demarcates the perimeter of building.
As you can see from Photo #2, the new back wall is only several feet from existing electrical lines and
transformer equipment.
This affects:
Window at steam shower. We can:
a. Keep window as in Pinto elevation and build a wall to conceal equipment. This alleyway, about
4' deep, can be planted and we can grow vines on the wall for greenery.
b. Keep window but instead of clear glass install translucent glass for light, no view.
c. Eliminate window.
Let me know your thoughts.
Regards,
Silvina
EFTA00748810
Document Preview
Document Details
| Filename | EFTA00748810.pdf |
| File Size | 39.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 947 characters |
| Indexed | 2026-02-12T13:57:39.583186 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.