Back to Results

EFTA00749626.pdf

Source: DOJ_DS9  •  Size: 131.1 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: "Gary Kerney" To: "Jeffrey Epstein" <jeevacation@grnail.com> Cc: "Doug Schoettle" Subject: RE: FW: LSJ - Pool and Main Residence Date: Sat, 13 Nov 2010 18:33:32 +0000 Jeffrey The time to get proposals from MEP and structral is after schematic design. At that point we can influence the slinplicty of what we want ,especially structral where they overdesigned before.We also talked to warwick that we want to go with split systems in several areas which have minimal involvment of mech.gesign. I would also wait for the schematic for const.adm. I think asking for fees at this time will result in higher fees to cover unknowns which will be resolved after schematic and pre construction doc. conferences. Gary From: Jeffrey Epstein [mailto:jeevacation@gmail.oarn] Sent: Sat 11/13/2010 9:39 AM To: Gary Kerney Subject: Re: FW: LSJ - Pool and Main Residence ask them to provide contracts for mechanical construction. and administration. On Sat, Nov 13, 2010 at 12:52 PM, Gary Kerney < > wrote: Jeffrey This fee is in line with schematic design per my estimate ,I reccomend you approve. Gary From: Warwick Wicksman [mailto Sent Fri 11/12/2010 6:32 PM To: Gary Kerney Cc: Tom Sze; Doug Schoettle; Zattia Mitchell; Rich Kahn; Darren Indyke (AOL) Subject RE: LSJ - Pool and Main Residence Hi Gary, Attached is our proposal for the pool area and main residence. This is to develop the current scheme, for just this area, to a Schematic Design level. Once that is done, assuming there are no major changes, we will provide a separate proposal to prepare construction documents and engineering as necessary. This will simply the CD phase, and simply the work of any required consultants. I am working on proposals for conceptual design services the Spa and Guest Cottage, and will send them on Monday. Thanks, EFTA00749626 Warwick Warwick Wicksman, AIA Principal 310.449.5790 Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA From: Gary Kerney [mailto: Sent: Wednesday, November 10, 2010 3:33 AM To: Warwick Wicksman Subject: Fwd: LSJ FYI Fl let's get the doc's going, include the spa Sent from my iPhone Begin forwarded message: From: "Jeevacation" <jeevacation@gmail.com> Date: November 10, 2010 7:11:18 AM AST To: "Gary Kerney" Subject: Re: LSJ Yes fl Sorry for all the typos .Sent from my iPhone On Nov 10, 2010, at 1:07 PM, "Gary Kerney" < > wrote: Jeffrey were the 11/3 Fl or F2 schemes close enough to your concept to have Gensler take one of them to the next level and contract? also should they be producing a schematic for the SPA to review From: Warwick Wicksman [mailto Sent: Tue 11/9/2010 7:27 PM To: Gary Kerney; Doug Schoettle Cc: Tom Sze Subject: LSJ EFTA00749627 Guys, any word from Jeffrey on how he wants to proceed? Wanvick Warwick Wicksman, A1A Principal 310.449.5790 Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation@gmail.com, and destroy this communication and all copies thereof, including all attachments. EFTA00749628

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00749626.pdf
File Size 131.1 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,536 characters
Indexed 2026-02-12T13:57:55.104254
Ask the Files