Back to Results

EFTA00750625.pdf

Source: DOJ_DS9  •  Size: 33.9 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: brice gordon To: "jeevacation®gmail.com" leevacation®gmail.com> Subject: Fwd: Zorro: Well Development Date: Fri, 04 Jun 2010 12:22:26 +0000 Attachments: Well Development.pdf resending Forwarded message From: brice gordon Date: Wed, Jun 2, 2010 at 9:35 AM Subject: Zorro: Well Development To: jeties@grrtn Cc: Darren Indyke Confirming our conversation in regard to Well Development I. Confirming I/ Frank Bond can proceed with filing an amendment to the present Settlement Agreement ( Dakota Well ) before the WRD. Changing the present well location stated in the settlement agreement to the new location shown in the attachment. In doing so this will cut down on infrastructure costs. 2. Proceed with submitting well spec to drillers for bids. Brice EFTA00750625

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA00750625.pdf
File Size 33.9 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 793 characters
Indexed 2026-02-12T13:58:15.493780
Ask the Files