Back to Results

EFTA00752840.pdf

Source: DOJ_DS9  •  Size: 44.8 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: "Gary Kerney" To: "Jeevacation" <jeevacation(d,.gmail.com> Subject: RE: LSJ Date: Wed, 10 Nov 2010 14:43:17 +0000 Jeffrey I put a rough estimate together for everything on the Fl plan including the two cottages for about 54,500,000 based on a bunch of assumptions I do this at this stage to give you the order of magnitude and give us a basis to analyze the architects fees From: Jeevacation [mailto:jeevacation@gmail.com] Sent: Wed 11/10/2010 6:11 AM To: Gary Kerney Subject: Re: LS) Yes fl Sony for all the typos .Sent from my iPhone On Nov 10, 2010, at 1:07 PM, "Gary Kerney" < Jeffrey > wrote: were the 11/3 Fl or F2 schemes close enough to your concept to have Gensler take one of them to the next level and contract? also should they be producing a schematic for the SPA to review From: Warwick Wicksman [mailto Sent: Tue 11/9/2010 7:27 PM To: Gary Kerney; Doug Schoettle Cc: Tom Sze Subject: LS) Guys, any word from Jeffrey on how he wants to proceed? Warwick Warwick Wicksman, AIA Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA EFTA00752840

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Email Addresses

Document Details

Filename EFTA00752840.pdf
File Size 44.8 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,105 characters
Indexed 2026-02-12T13:58:52.469314
Ask the Files