Back to Results

EFTA02288376.pdf

Source: DOJ_DS11  •  Size: 59.4 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

To: Cc: From: Sent: Subject: Carlos Rodriguez Richard Kahn Wed 5/29/2019 7:36:46 PM Re: Denali A/C Daphne Wallace carlos please call vendor every day until the part arrives..and provide us all with updates thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor Ncw York, NY 10022 tel fax ccl On May 29, 2019, at 3:33 PM, Carlos Rodriguez wrote: It should be a same day turn around, Thank you Carlos On Wednesday, May 29, 2019, 3:21:27 PM AST, wrote: Carlos, once the part is in (5 working days is June 5th) how long will it take to have the part installed? will they turn it around same day? Jeffrey will be on the island from June 3-10... On May 29, 2019, at 3:08 PM, Carlos Rodriguez •r r. wrote: Greetings all, I just picked up the Denali from dealership, they have ordered an a/c hose that had a leak, should be here in 5 days. A complete service was performed on it and rear brake pads were changed. as soon as the part arrives i will bring back to dealership for install. To follow i will send invoice. Thnk you Carlos EFTA_R1_01116598 EFTA02288376

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02288376.pdf
File Size 59.4 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,111 characters
Indexed 2026-02-12T14:01:34.680135
Ask the Files