EFTA02287847.pdf
PDF Source (No Download)
Extracted Text (OCR)
rodriq
Groff[I
a Shuliak[
j; Stephanie
ick
; Lesley
om]. Ri
1: ann
To:
michael lidde
Reming on
From:
Daphne Wallace
Sent:
Tue 5/28/2019 10:13:42 PM
Subject Shipping Updates - May 28, 2019
Greetings Mike,
Arrived/Sailed/Booked to Sail
- Fletcher Larkin Building Supplies - (12) cement bags for construction stock -
on STT 5/11 - cleared, off-loaded, awaiting pickup
- on STT 5/11 - cleared, off-loaded, awaiting pickup
- GEI Works - Type 2 HD Permeable Silt Barrier for GSJ
- American Export - LSJ GYM Doors & Windows replacement
- 2019 Freightliner 122SD dump truck - on SIT - registered, parked, awaiting
transport over to LSJ
- on STT 5/22 - cleared, off-loaded, awaiting pickup
- Tiki Shack Importers - (70) rolls of Thatch
- Wayfair - (100) Pure Garden Solar Path Bollard LED Pathway Lights, per JE
- Warren CAT - (I) Caterpillar CS54B Roller with Shell Kit - on STT 5/22 -
cleared, awaiting pickup
- on STT 5/28 - cleared, awaiting pickup
- BeverageFactory.com - Summit Appliance Commercial Outdoor Freezer for
Tiki House
for LSJ
- Home Depot - H0220-160458 - (2) Samsung washers and (2) Samsung dryers
BOL 13677820 - EBL Watercraft - GIBBS Quadski returned to dealer for repairs per JE -
dismantling in progress - NOW initial findings by 5/31
BOL 13623863 - 2015 GMC Yukon Denali (JE) - EDA in Le Havre France 5/26 - awaiting
confirmation of arrival
AN aiting Delivery to Tropical - Or to LSJ via FEDEX. ETC.
ABC Nursery - (50) White Oleanders, (200) White Fountain grass, (12) Ficus trees - EDA on
SIT 5/28 - EDA ready for pickup 5/31
Tropicars - (3) 2019 Polaris Ranger EV, rust proofing kit included - units received at shop 5/23 -
rust proofing 5/31 - EDA to Tropical FL 6/7
Online Fabric Store - (5000) yards Jute Erosion Control Cloth, selected by JE - purchased 5/28 -
EFTA_R1_0 1115762
EFTA02287847
EDA to Tropical FL 6/7
JCH - Final Cistern Pump for LSJ - ordered 5/24 - Lead time 6 weeks - EDA to Tropical FL
7/10
Innovation Solar Garden Products - (2000) Garden lights - sailed from China 5/21 - EDA to MIA
45 days (7/3) - NOW EDA to STT 7/27
Blue Ocean Tackle Inc - (4) Ocean Guard Netless Fenders for Big N - purchased 5/24 - Lead
time 10 weeks - EDA ready to ship 8/2
Buck Steel - Project BS36653 Order - 40 x 60 Steel building replacement for Heavy machinery
storage - Approved and Signed Plan Drawings submitted 5/24 - Authorization to Release
submitted 5/28 - Lead time 12 weeks - EDA to Tropical FL 8/23
EFTA_R1_0 1115763
EFTA02287848
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02287847.pdf |
| File Size | 164.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,512 characters |
| Indexed | 2026-02-12T14:01:54.301178 |