Back to Results

EFTA02290336.pdf

Source: DOJ_DS11  •  Size: 419.2 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

To: Jeffre E tein 'eevacation mail.com] Cc: From: Richard Kahn Sent Thur 6/13/2019 1:46:46 PM Subject Fwd: Cable Routes Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor New York, NY 10022 Begin forwarded message: From: Date: June 13, 2019 at 9:45:19 AM EDT To: Paul Gandy <a> Cc: Daphne Wallace Anna Rodriguez IIMMin Mike Glidden < , Rich Kahn Subject: Re: Cable Routes Hello Paul and thank you very much for this summary. On Jun 13, 2019, at 7:40 AM, Paul Gandy SIM. wrote: Thank you yes the trip was very successful and clarified the project for us. We were able to meet with Michael and tour both islands and the facilities that were recently added. We also discussed the project goals for Michael which allowed us to narrow our scope of services from our earlier discussions about various cable routes, etc. Additionally, we have examined 18 months of previous electrical usage to assist us in confirming loads and capacity for the LSJ consumption. Michael also provided with information regarding the seawater RO plant and distribution pumping system for purposes of developing and scope for providing a water line over to GSJ. We are currently preparing two separate scopes/proposals. One for engineering of an electrical power loop around GSJ, to be installed by Owner's contract forces and one for project management and/or turnkey EFTA_R1_01123355 EFTA02290336 installation of the short run of submarine cable and water line from LSJ to GSJ including landslide power equipment and facilities on each side. We are currently conducting some preliminary engineering activities in order to develop the scope and cost for each proposal and time frame for the work. We expect to have a proposal for the first scope of services (GSJ Electrical Loop engineering)to Michael for review on Monday, June 17th. The second proposal should come a few days after that as we are awaiting equipment delivery times and input from installation forces to complete the scope. We also continue to speak with Michael as questions come up and we are speaking with Bioimpact as well to coordinate on the subaqueous permitting side of the crossing. Thank you for assisting in setting up the visit and having us over. Best regards, Paul Gandy, PE Globaltech, Inc. On Jun 11, 2019, at 2:14 PM, > wrote: HI Paul...hope your trip was successful...wanted to follow up and see if you had your thoughts on the project to provide to Mike? Lesley n M 3 2 19 5-1 PM, Paul Gandy > wrote: High guys, update: Nico Sham- and I will be arriving Sunday, June 2, AA Flight 1391 2:57PM We depart Tuesday, June 4, AA Flight 943 2:41PM. We will have a car and we'll be staying near Redhook area...waiting for hotel/condo confirmation now. Mike, I am assuming we will come there first on Monday to get a look EFTA_R1_01123356 EFTA02290337 at the existing facilities as we talked about, discuss the recent/previous improvements, plans for both sides and thoughts on the project approach, etc. I assume you will want us to meet in Redhook on Monday morning for shuttle over but let me know if there arc different arrangements, or let me know time and place. Also, we are completely flexible on schedule and, if one day isn't enough to see and discuss everything, then we will also have time on Tuesday morning. My cell phone is Look forward to meeting with you all. Regards, Paul Gandy, PE President Globaltech, Inc. On May 30, 2019, at 8:45 AM, wrote: all sounds great! I'm sure our staff can get you to from the island on the boat on Mon 3rd and Tues. 4th!. On May 30, 2019, at 8:23 AM, Paul Gand wrote: Thanks= I will forward flight details. It was our intent to rent a car/hotel on St. Thomas and meet at Redhook for trip over on Monday/Tuesday so we would have mobility to look at EFTA_R1_01123357 EFTA02290338 previous work, etc. No need to impose on staff (except for the boat ride over) unless you have other plans for us. Let me know. Regards, Paul Gandy, PE Globaltcch, Inc. On May 30, 2019, at 6:54 AM, > wrote: Good mornin g Paul. Jeffrey says a trip from this Sunday to Tuesda y works! Please do procee d with travel arrange ments and let me know the details. We will be EFTA_R1_01123358 EFTA02290339 sure to have you picked up by Jeffrey' s staff, etc. thanks On May 29, 2019, at 8:51 PM, Paul Gandy 1 1 1 wrote: Hi M. How does this Monday, June 3rd work? We would travel down on Sunday giving us all day Monday and Tuesday morning, returning to Miami on Tuesday afternoon. It will be myself and one of our electrical engineers as we need to review existing facilities at the site(s). This should be enough time. Let me know and I will book travel arrangements. Regards, Paul Gandy, PE Globaltech, Inc. On May 29, 2019, at 7:47 PM, wrote: EFTA_R1_01123359 EFTA02290340 HI Paul...Jeffrey was asking me again when you think you can come...please do provide dates as soon as possible.. thanks! On May 29, 2019, at 7:14 AM, Paul Gandv wrote: Thanks It's looking like next week. We had a few commitments to clear out and also to give everyone a chance to review the does. I will get back to you today with some dates. Thanks again. Regards, Paul Gandy, PE Globaltech, Inc. On May 28, 2019, at 5:55 PM, wrote: Help Paul. Following up on this! Please let us know when you can visit the island!!! Sent from my iPhone Begin forwarded message: From: Date: May 24, 2019 at 10:21:26 AM EDT EFTA_R1_01123360 EFTA02290341 Subject: Fwd: Cable Routes Hello Paul. Would you please let me know when you can visit the island? The sooner the better please. Look forward to hearing back from you. Assistant to Jeffrey Epstein Begin forward ed message From: michael glidden Subjec t: Re: Cable Routes Date: May 21, 2019 at 10:32:3 6 AM EDT EFTA_R1_01123361 EFTA02290342 To: Paul Gandy Cc: Richard Kahn Daphn e Wallac e Stepha nie Reming Good morning Paul. Looking forward to your visit. On Tue, May 21, 2019 at 10:29 AM Paul EFTA_R1_01123362 EFTA02290343 Gand wrote: Michael, Just to confirm, we have received all the informat ion. We forward ed some of it to the folks at Center Marine and our in house electrica I folks have looked at it. The next step for us is to come down and take a look as you suggeste d. I'm getting our schedule together now and will be EFTA_R1_01123363 EFTA02290344 back to you shortly to work out timing that is good for you. Thanks again for sending. Regards Paul Gandy, PE Globalte ch, Inc. On May 7, 2019, at 3:45 PM, michael glidden wrote: EFTA_R1_01123364 EFTA02290345

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02290336.pdf
File Size 419.2 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 6,822 characters
Indexed 2026-02-12T14:02:11.638224
Ask the Files