EFTA02290336.pdf
PDF Source (No Download)
Extracted Text (OCR)
To:
Jeffre E tein 'eevacation
mail.com]
Cc:
From:
Richard Kahn
Sent
Thur 6/13/2019 1:46:46 PM
Subject Fwd: Cable Routes
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue, 4th Floor
New York, NY 10022
Begin forwarded message:
From:
Date: June 13, 2019 at 9:45:19 AM EDT
To: Paul Gandy <a>
Cc: Daphne Wallace
Anna Rodriguez
IIMMin
Mike Glidden <
, Rich Kahn
Subject: Re: Cable Routes
Hello Paul and thank you very much for this summary.
On Jun 13, 2019, at 7:40 AM, Paul Gandy
SIM.
wrote:
Thank you
yes the trip was very successful and clarified the project for us.
We were able to meet with Michael and tour both islands and the
facilities that were recently added. We also discussed the project goals
for Michael which allowed us to narrow our scope of services from
our earlier discussions about various cable routes, etc. Additionally,
we have examined 18 months of previous electrical usage to assist us
in confirming loads and capacity for the LSJ consumption. Michael
also provided with information regarding the seawater RO plant and
distribution pumping system for purposes of developing and scope for
providing a water line over to GSJ.
We are currently preparing two separate scopes/proposals. One for engineering of
an electrical power loop around GSJ, to be installed by Owner's
contract forces and one for project management and/or turnkey
EFTA_R1_01123355
EFTA02290336
installation of the short run of submarine cable and water line from
LSJ to GSJ including landslide power equipment and facilities on each
side.
We are currently conducting some preliminary engineering activities in order to
develop the scope and cost for each proposal and time frame for the
work. We expect to have a proposal for the first scope of services
(GSJ Electrical Loop engineering)to Michael for review on Monday,
June 17th. The second proposal should come a few days after that as
we are awaiting equipment delivery times and input from installation
forces to complete the scope.
We also continue to speak with Michael as questions come up and we are speaking
with Bioimpact as well to coordinate on the subaqueous permitting
side of the crossing.
Thank you for assisting in setting up the visit and having us over.
Best regards,
Paul Gandy, PE
Globaltech, Inc.
On Jun 11, 2019, at 2:14 PM,
> wrote:
HI Paul...hope your trip was successful...wanted to
follow up and see if you had your thoughts on the project
to provide to Mike?
Lesley
n M
3 2 19
5-1 PM, Paul Gandy
> wrote:
High guys, update:
Nico Sham- and I will be arriving Sunday, June 2, AA Flight 1391
2:57PM
We depart Tuesday, June 4, AA Flight 943 2:41PM.
We will have a car and we'll be staying near Redhook area...waiting for
hotel/condo confirmation now.
Mike, I am assuming we will come there first on Monday to get a look
EFTA_R1_01123356
EFTA02290337
at the existing facilities as we talked about,
discuss the recent/previous improvements,
plans for both sides and thoughts on the
project approach, etc. I assume you will
want us to meet in Redhook on Monday
morning for shuttle over but let me know if
there arc different arrangements, or let me
know time and place. Also, we are
completely flexible on schedule and, if one
day isn't enough to see and discuss
everything, then we will also have time on
Tuesday morning.
My cell phone is
Look forward to meeting with you all.
Regards,
Paul Gandy, PE
President
Globaltech, Inc.
On May 30, 2019, at 8:45 AM,
wrote:
all sounds great! I'm sure our
staff can get you to from the
island on the boat on Mon 3rd
and Tues. 4th!.
On May 30, 2019,
at 8:23 AM, Paul
Gand
wrote:
Thanks= I will forward flight details.
It was our intent to rent a car/hotel on St. Thomas and
meet at Redhook
for trip over on
Monday/Tuesday
so we would have
mobility to look at
EFTA_R1_01123357
EFTA02290338
previous work, etc.
No need to impose
on staff (except for
the boat ride over)
unless you have
other plans for us.
Let me know.
Regards,
Paul Gandy, PE
Globaltcch, Inc.
On May 30, 2019, at 6:54 AM,
> wrote:
Good
mornin
g Paul.
Jeffrey
says a
trip
from
this
Sunday
to
Tuesda
y
works!
Please
do
procee
d with
travel
arrange
ments
and let
me
know
the
details.
We
will be
EFTA_R1_01123358
EFTA02290339
sure to
have
you
picked
up by
Jeffrey'
s staff,
etc.
thanks
On
May
29,
2019,
at 8:51
PM,
Paul
Gandy
1
1
1
wrote:
Hi M.
How does this Monday, June 3rd
work? We would travel down on Sunday
giving us all day Monday and Tuesday
morning, returning to Miami on Tuesday
afternoon.
It will be myself and one of our electrical
engineers as we need to review existing
facilities at the site(s). This should be enough
time.
Let me know and I will book travel
arrangements.
Regards,
Paul Gandy, PE
Globaltech, Inc.
On May 29, 2019, at 7:47 PM,
wrote:
EFTA_R1_01123359
EFTA02290340
HI Paul...Jeffrey was asking me again
when you think you can come...please
do provide dates as soon as possible..
thanks!
On May 29, 2019, at 7:14 AM,
Paul Gandv
wrote:
Thanks
It's looking like
next week. We had a few
commitments to clear out and
also to give everyone a chance to
review the does. I will get back
to you today with some dates.
Thanks again.
Regards,
Paul Gandy, PE
Globaltech, Inc.
On May 28, 2019, at 5:55 PM,
wrote:
Help Paul. Following up on
this! Please let us know
when you can visit the
island!!!
Sent from my iPhone
Begin forwarded message:
From:
Date: May 24, 2019
at 10:21:26 AM
EDT
EFTA_R1_01123360
EFTA02290341
Subject: Fwd:
Cable Routes
Hello Paul. Would
you please let me
know when you can
visit the island? The
sooner the better
please. Look
forward to hearing
back from you.
Assistant to Jeffrey
Epstein
Begin
forward
ed
message
From:
michael
glidden
Subjec
t: Re:
Cable
Routes
Date:
May
21,
2019 at
10:32:3
6 AM
EDT
EFTA_R1_01123361
EFTA02290342
To:
Paul
Gandy
Cc:
Richard
Kahn
Daphn
e
Wallac
e
Stepha
nie
Reming
Good
morning
Paul.
Looking
forward
to your
visit.
On Tue,
May 21,
2019 at
10:29
AM
Paul
EFTA_R1_01123362
EFTA02290343
Gand
wrote:
Michael,
Just to
confirm,
we have
received
all the
informat
ion. We
forward
ed some
of it to
the folks
at
Center
Marine
and our
in house
electrica
I folks
have
looked
at it.
The next
step for
us is to
come
down
and take
a look
as you
suggeste
d. I'm
getting
our
schedule
together
now and
will be
EFTA_R1_01123363
EFTA02290344
back to
you
shortly
to work
out
timing
that is
good for
you.
Thanks
again
for
sending.
Regards
Paul
Gandy,
PE
Globalte
ch, Inc.
On May
7, 2019,
at 3:45
PM,
michael
glidden
wrote:
EFTA_R1_01123364
EFTA02290345
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02290336.pdf |
| File Size | 419.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 6,822 characters |
| Indexed | 2026-02-12T14:02:11.638224 |