EFTA02288526.pdf
Extracted Text (OCR)
To:
michael lidden
hanie Remin ton
Patrick Cena
; Rich
Kahn
Karyna
Shuliak
From:
Daphne Wallace
Sent:
Fri 5/24/2019 10:08:34 PM
Subject:
Shipping Updates - May 24, 2019
Greetings Mike,
STT Items for transport to LSJ via Little C
ABC Nursery Plants - (25) Sea grapes, (20) tree braces AND (6) rolls of Weed cloth for LSJ - on
LSJ
Arrived/ ailed/Booked to Sail
El`
- Lewis Marine - dock lines - on STT 5/14 - on LSJ
- Fletcher Larkin Building Supplies - (12) cement bags for construction stock -
on STT 5/1 I - cleared, off-loaded, awaiting pickup
- on STT 5/11 - cleared, off-loaded, awaiting pickup
- GEI Works - Type 2 HD Permeable Silt Ranier for GSJ
- American Export - LSJ GYM Doors & Windows replacement
- 2019 Freightliner 122SD dump truck - on STT - registered, parked, awaiting
transport over to LSJ
- on STT 5/22 - cleared, off-loaded, awaiting pickup
- Tiki Shack Importers - (70) rolls of Thatch
- Wayfair - (100) Pure Garden Solar Path Bollard LED Pathway Lights, per JE
- Warren CAT - (I) Caterpillar CS54B Roller with Shell Kit - on STT 5/22 -
cleared, awaiting pickup
BOL 13745848 - sailing 5/24 - EDA on SIT 5/28
- BeverageFactory.com - Summit Appliance Commercial Outdoor Freezer for
Tiki House
- Home Depot - H0220-160458 - (2) Samsung washers and (2) Samsung dryers
for LSJ
BOL 13677820 - EBL Watercraft - GIBBS Quadski returned to dealer for repairs per JE -
diagnostics begin 5/24 - initial findings on 5/28
BOL 13623863 - 2015 GMC Yukon Denali (JE) - EDA in Le Havre France 5/26
Awaiting Delivery to Tropical - Or to LSJ via FEDEX. ETC.
ABC Nursery - (50) White Oleanders, (200) White Fountain grass, (12) Ficus trees - EDA on
STT 5/28 - EDA ready for pickup 5/31
EFTA_R1_01116871
EFTA02288526
Tropicars - (3) 2019 Polaris Ranger EV, rust proofing kit included - units received at shop 5/23 -
rust proofing 5/31 - EDA to Tropical FL 6/7
Innovation Solar Garden Products - (2000) Garden lights - sailed from China 5/21 - EDA to MIA
45 days (7/3) - NOW EDA to STT 7/27
Blue Ocean Tackle Inc - (4) Ocean Guard Netless Fenders for Big N - purchased 5/24 - Lead
time 10 weeks - EDA ready to ship 8/2
Buck Steel - Project BS36653 Order - 40 x 60 Steel building replacement for Heavy machinery
storage - Approved and Signed Plan Drawings submitted 5/24 - Lead time 12 weeks - EDA to
Tropical FL 8/23
JCH - Final Cistern Pump for LSJ - ordered 5/24 - EDA to Tropical FL pending
EFTA_R1_01116872
EFTA02288527
Document Preview
Extracted Information
Document Details
| Filename | EFTA02288526.pdf |
| File Size | 161.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,478 characters |
| Indexed | 2026-02-12T14:02:14.013528 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.