Back to Results

EFTA02288526.pdf

Source: DOJ_DS11  •  email/external  •  Size: 161.8 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

To: michael lidden hanie Remin ton Patrick Cena ; Rich Kahn Karyna Shuliak From: Daphne Wallace Sent: Fri 5/24/2019 10:08:34 PM Subject: Shipping Updates - May 24, 2019 Greetings Mike, STT Items for transport to LSJ via Little C ABC Nursery Plants - (25) Sea grapes, (20) tree braces AND (6) rolls of Weed cloth for LSJ - on LSJ Arrived/ ailed/Booked to Sail El` - Lewis Marine - dock lines - on STT 5/14 - on LSJ - Fletcher Larkin Building Supplies - (12) cement bags for construction stock - on STT 5/1 I - cleared, off-loaded, awaiting pickup - on STT 5/11 - cleared, off-loaded, awaiting pickup - GEI Works - Type 2 HD Permeable Silt Ranier for GSJ - American Export - LSJ GYM Doors & Windows replacement - 2019 Freightliner 122SD dump truck - on STT - registered, parked, awaiting transport over to LSJ - on STT 5/22 - cleared, off-loaded, awaiting pickup - Tiki Shack Importers - (70) rolls of Thatch - Wayfair - (100) Pure Garden Solar Path Bollard LED Pathway Lights, per JE - Warren CAT - (I) Caterpillar CS54B Roller with Shell Kit - on STT 5/22 - cleared, awaiting pickup BOL 13745848 - sailing 5/24 - EDA on SIT 5/28 - BeverageFactory.com - Summit Appliance Commercial Outdoor Freezer for Tiki House - Home Depot - H0220-160458 - (2) Samsung washers and (2) Samsung dryers for LSJ BOL 13677820 - EBL Watercraft - GIBBS Quadski returned to dealer for repairs per JE - diagnostics begin 5/24 - initial findings on 5/28 BOL 13623863 - 2015 GMC Yukon Denali (JE) - EDA in Le Havre France 5/26 Awaiting Delivery to Tropical - Or to LSJ via FEDEX. ETC. ABC Nursery - (50) White Oleanders, (200) White Fountain grass, (12) Ficus trees - EDA on STT 5/28 - EDA ready for pickup 5/31 EFTA_R1_01116871 EFTA02288526 Tropicars - (3) 2019 Polaris Ranger EV, rust proofing kit included - units received at shop 5/23 - rust proofing 5/31 - EDA to Tropical FL 6/7 Innovation Solar Garden Products - (2000) Garden lights - sailed from China 5/21 - EDA to MIA 45 days (7/3) - NOW EDA to STT 7/27 Blue Ocean Tackle Inc - (4) Ocean Guard Netless Fenders for Big N - purchased 5/24 - Lead time 10 weeks - EDA ready to ship 8/2 Buck Steel - Project BS36653 Order - 40 x 60 Steel building replacement for Heavy machinery storage - Approved and Signed Plan Drawings submitted 5/24 - Lead time 12 weeks - EDA to Tropical FL 8/23 JCH - Final Cistern Pump for LSJ - ordered 5/24 - EDA to Tropical FL pending EFTA_R1_01116872 EFTA02288527

Document Preview

Extracted Information

Dates

Document Details

Filename EFTA02288526.pdf
File Size 161.8 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,478 characters
Indexed 2026-02-12T14:02:14.013528

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files