Back to Results

EFTA02286850.pdf

Source: DOJ_DS11  •  email/partial  •  Size: 167.7 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

To: Richard Kahn Cc: Stephanie Remingto • n nquez From: michael glidden Sent Wed 5/22/2019 1:48:47 PM Subject Re: Punchlist #21 Yes, the road from Mr Wind to the flagpole pool will be first and has already been partially graded. Sent from my iPhone On May 22, 2019, at 9:01 AM, Richard Kahn wrote: jee said yesterday that mr windy road is to begin first is that what you are referring to below? please update punchlist with dates.. thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor New York, NY 10022 On May 20, 2019, at 1:58 PM, Stephanie Remington aMISIMMF wrote: Perfect. Thank you, Mr. Jeffers. Stephanie Remington LSJE, LLC On Mon, 20 May 2019 at 13:01, Eason Jeffers <MniiMi a wrote: Good Day Stephanie, EFTA_R1_01113293 EFTA02286850 I will get in touch with Mike to take some measurements and verify quantities this week. Kindest Regards, Eason Jeffers President uantum Vision Construction LLC On Mon, May 20 2019 10-40 AM h nie Remington wrote: Good day, Mr. Jeffers, We have plenty of material here for you to begin on the Flagpole Pool Road. This is the owner's first priority. We look forward to you beginning this project on Tuesday, May 28. The owner's second priority is the road going toward the gym all the way up to the Sun Dial. His third priority is a small road going from the beach up to the Flagpole. The owner would like for you to work in this order of priority. Do you need to return to the island this week to take further measurements or organize material in preparation for next week's start date? Please confirm the total amount of all materials needed so that we can preemptively procure them for future weeks' projects. Please be in touch with any questions. Thank you, Stephanie Remington LSJE, LLC On Sun, 19 May 2019 at 19:16, Eason Jeffers wrote: Good Day, Mr Epstein chose a color sample labeled #3 for the flag road. That sample will use about 21 pounds of color per cubic yard of concrete with gray cement. Mr. Epstein also mentioned doing two EFTA_R1_01113294 EFTA02286851 roads in that area, one being the "Beach Road". I need assistance and confirmation in identifying that road. I also need verification as to whether this is an added amount to the sample roads or if we will do this one in lieu of the Sundial Road. Or if the "Beach Road" is the same as the Sundial Road. I will then be able to send the total quantities of materials needed along with any changes or additions/subtractions. Kindest Regards, Eason Jeffers President uantum Vision Construction LLC EFTA_R1_01113295 EFTA02286852

Document Preview

Document Details

Filename EFTA02286850.pdf
File Size 167.7 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,643 characters
Indexed 2026-02-12T14:02:25.469690

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files