EFTA02287928.pdf
PDF Source (No Download)
Extracted Text (OCR)
1: Rich Kahn[
esl
Gro
; michael glidden
Patrick Cen
To:
ann rodri uez
From:
Daphne Wallace
Sent
Mon 6/3/2019 4:14:09 PM
Subject Fwd: Mold Remediation
Greetings,
Seth and I spoke this morning. This is the schedule, to be confirmed by tomorrow 6/4:
Equipment is delivered to Tropical FL 6/5, sails Friday, 6/7 - EDA on STT 6/11 - cleared 6/12
and transported to LSJ
Seth and crew (2-3) arrive STT 6/12 - will stay on Sapphire property - Crystal Cove condos (2),
Sapphire Village (2)
Seth will email the remediation proposal schedule - estimating 6/13-6/20 (my estimate until Seth
confirms)
Seth will only ship scrubbers/dehumidifier equipment - the tools will be checked in and brought on
their flight
He will have the names and DOB information for the crew you me by tomorrow so I can purchase
the tickets.
----- Forwarded message
From: SETH ETTINGER <1
Date: Mon, Jun 3, 2019 at 10:45 AM
Subject: Mold Remediation
To: Daphne Wallace
Hey Daphne!
I'm all through with my Monday morning appointments. I have one more at 12:00 but shouldn't
take long. If you would like to talk , I am available.
Thank you .
Regards,
Seth Ettinger
Restore & More LLC.
Mold Removal West Palm Beach Delray Beach Mold Removal Boca Raton Water Damage West
Palm Beach
EFTA_R1_01115889
EFTA02287928
Mold Removal West Palm Beach Delray
Beach Mold Removal Boca Raton Water
Damage West Palm Beach
r...atr, Fire & Wind
'7
Boca Raton South
Florida 24,7 Emergency Service Mold Remediation.
EFTA_R1_01115890
EFTA02287929
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA02287928.pdf |
| File Size | 99.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,533 characters |
| Indexed | 2026-02-12T14:03:02.860731 |