EFTA02290381.pdf
PDF Source (No Download)
Extracted Text (OCR)
To:
Daphne Wallace
Cc:
Rich Kahn
From:
Sent:
Thur 6/13/2019 2:45:58 PM
Subject: Re: GSJ BARN BUILDING
yes, correct... 1 just spoke to Jeff and he gave me this same information...I relayed to JE..
On Jun 13, 2019, at 10:43 AM, Daphne Wallace ‹
> wrote:
I presume you spoke to Jeffrey.
He has been asking MG for this information.
Forwarded message
From: Jeffrey Boschulte
Date: Thu, Jun 13, 2019, 10:40 AM
Subject: Re: GSJ BARN BUILDING
To:
>, LSJ Michael Glidden
Hi Mike/Daphne,
Regarding the barn building project, a selection needs to be made for the steel building
manufacturer. We cannot move foward with the design and permitting
submission without the steel strucure package from the manufacturer.
Thank you,
Jeffrey Boschulte, AIA
CEO, Boschulte Architecture, LLC
wwwtoschulte.com I Skype
41-42 Kongens Gade, St. Thomas, VI 00803
Create your own email signanme
From: Jeffrey Boschulte
Sent: Monday, June 10, 2019 5:11 PM
To: a
151 Michael Glidden
Subject: G51 BARN BUILDING
Good day,
EFTA_R1_01123731
EFTA02290381
I was following up to see if a steel building manufacturer has been selected for the Barn Buidling
as yet, so that we can move forward with the design of this project.
Please let me know - thanks!
Jeffrey Boschulte, AIA
CEO. Boschulte Architecture. LLC
www.boschulte.com I Skype:
41-42 Kongens Gade. St. Thomas. VI 00803
EFTA_R1_01123732
EFTA02290382
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02290381.pdf |
| File Size | 88.3 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,416 characters |
| Indexed | 2026-02-12T14:03:23.276180 |