Back to Results

EFTA02289965.pdf

Source: DOJ_DS11  •  Size: 167.4 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

To: Cena Grof Pascal From: Sent: Subject: Shipping Updates - June 4, 2019 Wed 6/5/2019 12:27:55 AM Greetings Mike, Patrick Arrived/Sailed/Booked to Sail - Fletcher Larkin Building Supplies - (12) cement bags for construction stock - on STT 5/11 - cleared, off-loaded, awaiting pickup - on STT 5/11 - cleared, off-loaded, awaiting pickup - GEI Works - Type 2 HD Permeable Silt Barrier for GSJ - American Export - LSJ GYM Doors & Windows replacement - on STT 5/22 - cleared, off-loaded, awaiting pickup - Tiki Shack Importers - (70) rolls of Thatch - Wayfair - (100) Pure Garden Solar Path Bollard LED Pathway Lights, per JE - Warren CAT - (1) Caterpillar CS54B Roller with Shell Kit - on STT 5/22 - cleared, awaiting pickup Tiki House for LSJ - on STT 5/28 - cleared, off-loaded, awaiting pickup - BeverageFactory.com - Summit Appliance Commercial Outdoor Freezer for - Home Depot - H0220-160458 - (2) Samsung washers and (2) Samsung dryers - (50) White Oleanders, (200) White Fountain grass, (12) Ficus trees - at ABC Nursery - pick up Wednesday, 6/5 BOL 13640381 - 2019 Freightliner 122SD dump truck - on LSJ BOL 13623861 - 2015 GMC Yukon Denali (JE) - Denali ready for pick up BOL 13764060 - Online Fabric Store - (5000) yards Jute Erosion Control Cloth - scheduled to sail 6/5 - EDA on STT 6/9 Awaiting Delivery to Tropical - Or to LSJ via FEDEX. ETC. Amazon - Bench-top Mortise'. - ordered 5/31 - EDA to Tropical FL 6/6 SiteOne Landscape - (3) pallets Seed Starter, 20-20-20 fertilizer - purchased 6/3 - EDA to Tropical FL 6/7 Amazon - Shaper for Carpentry - ordered 5/31 - EDA to Tropical FL 6/10 EFTA_R1_01121183 EFTA02289965 Tropicars - (3) 2019 Polaris Ranger EV, rust proofing kit included - NOW rust proofing 6/12 - EDA to Tropical FL 6/21 Amazon - Industrial Planer - ordered 5/31 - EDA to Tropical FL 6/27 JCH - Final Cistern Pump for LSJ - ordered 5/24 - Lead time 6 weeks - EDA to Tropical FL 7/12 JCH - Components for Pump Control System - ordered 6/4 - EDA to ready to ship 6/30 Innovation Solar Garden Products - (2000) Garden lights - sailed from China 5/21 - EDA to MIA 45 days (7/3) - NOW EDA to STT 7/27 Blue Ocean Tackle Inc - (4) Ocean Guard Netless Fenders for Big N - purchased 5/24 - Lcad time 10 weeks - EDA ready to ship 8/2 Buck Steel - Project BS36653 Order - 40 x 60 Steel building replacement for Heavy machinery storage - Building released to production 6/3 - Lcad time 12 weeks - EDA to ready to ship 8/26 EFTA_R1_01121184 EFTA02289966

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02289965.pdf
File Size 167.4 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,518 characters
Indexed 2026-02-12T14:04:10.468139
Ask the Files