JE Punch List —June 11, 2012
1. Five Palms —TOP PRIORITY
- Exterior Door Shutters — removable option
- Painting - outside to be completed after visit
- Piano - needs tuner
- Lights - add two more lights to front of Five Palms in trees
- Mirrored siding — Panels sailed 6/8, EDA on STT 6/12
- Glue on site
- Tapestry Molding for Ceiling — Ion
- Transformer building — Building 5/31, 5/25 — final electrical hookup 6/8 — temporarily powered by generator
- Flooring
- Books — books on site will relocate over the week of 6/4
- Benches —one bench to west north of fire pit
- Road grading
- Piano —at Tropical FL 6/8 — scheduled to sail 6/13, EDA on STT 6/16
2. Grotto-
- Floor resin
- Genset wiring— scheduling to be determined
3. Berm/Top of Hill
- dirt and rock needs on top of hill needs to go ASAP
- hydroseed top of hill
—4 large planter boxes with small planter inside require construction — size to be determined by JE
- cleanup and excavate — continues
- remove rock screener — completed
- run power to berm center from pull box
4. Engineering/Maintenance Yard
- Steel Shed — foundation in progress
- Metal Sheets - on old building will be replaced week of 6/4
5. Triangle — landscaping direction required from JE
6. Flagpole Pool Caba°~
- Recovering of sofa/chairs
- Furniture — needs new de
7. Entry Tree Lights — installati n complete
8. Solutions for Generators — Sound proofing solution forwarded to JE, require direction, wall built
9. Tiki — Darren is contacting the vendor regarding the shields
10. Dock —
- Decking — replace all damaged boards and carpet - complete
- Floating Dock -
- Jet ski Docking - review
- Table/Dock Box — Bill starting 6/4
11. Kite House— review of wooden outside furniture -
12. Chillax Room - requires furniture piece for electrical/media equipment
13. Chillax Bathroom - requires blue rugs for bathroom & vanity area
14. Mechanical Building
- Replacement Transformer - estimated date to be shipped from factory (Illinois) 8/21
EFTA_R1_01196876
EFTA02311184
15. Boats
- Midnight Express — purchase Yamaha 300 motors, install by Offshore Marine
- PRD — sell
- Lady G — sell
- Big N - sell
- Calypso — refurbish
16. Gym Road - road grading after Five Palms — continues
17. Timers — review installing timers on air conditioners, irrigation water systems, and lights
18. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond
and beach
19. Pergolas — construct 3 pergolas for benches at the top of the hill —continues
20. Main entrance/gravel/grade - complete
21. Wind Door — wind door on kitchen side needs adjusting
- wind door stops
22. Landscaping — gardenias
23. Solar lights
24. Roads — grade all roads — Wednesday 6/6 — Tom please review all roads so you can pitch, drain, with Jules
25. Library — lights on bookshelves need attention
- temperature?
26. Main hill — asphalt path
27. Master Suite —
- Large master bed planting
- Door in dressing area — the heavy mirrored door between the bed and bath is beginning to drag on the floor
- Add door handles to shutters on master bedroom door to be able to close from inside
28. Phones —
- Library terrace — phone does not work — repaired 6/11
- Flagpole — phone in cabana has all the wrong numbers as compared to the list on speed dial — label replaced
29. Media — sign up for Blockbuster, VUDU, HULU
EFTA_R1_01196877
EFTA02311185
Document Preview
Extracted Information
Dates
Document Details
| Filename | EFTA02311184.pdf |
| File Size | 184.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,448 characters |
| Indexed | 2026-02-12T14:23:41.223901 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.