Back to Results

EFTA02309482.pdf

Source: DOJ_DS11  •  schedule  •  Size: 140.1 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

From: Sent: Monday, June 25, 2012 11:27 PM To: Ka na Shuliak Cc: Subject: Re: 8h bathroom Do you want super white for both bedroom and living room? I have been hounding Andrew, the super intendant for an answer about us chan=ing the dishwasher for the washer/dryer unit as he seemed to have concerns a=out the plumbing. I'm waiting for an answer on that so I can schedule the a=pliances all at once. I've sent about 5 emails about it now and will keep c=lling him till I get an answer. On Jun 25, 2012, at 4:22 PM, Karyna Shuliak < > wrote: > the wall paint color I've chosen is called "super white" from Benjamin Moo=e. > Is there anything I should do about the kitchen M? > On Jun 25, 2012, at 6:55 PM, wrote: » Great. Michael can start in the bedroom for 8H for now. It won't affect t=em working in bathroom. I also want to get the appliances on kitchen change= out before the living room is painted which will hopefully happen by weeks=end. >> » On Jun 25, 2012, at 1:44 PM, > wrot=: >» I think Michael can purchase himself, he just needs the name of the colo=, so you can send to me or give to him. Yes we should take all the doorknob= off, which I think Michael can do, select new ones and also decide on the c=iling light if you want to change it.( outside the kitchen. Michael should a=so look at the wiring in the apartment. Any unnecessary wiring should be re=oved before he paints. >» >» Sent from my iPhone >>> >» On 25 Jun 2012, at 21:39, Karyna Shuliak < > wrote: >» »» last time Penn said that painting in 8H can get started on Fri this wee=, as they will have the shower doors delivered only on Wed. Also want to ch=ck if the door knobs and all the hardware should be removed prior to painti=g? »» yes, I've chosen the color, so I can bu it for Michael when needed »» On Jun 25, 2012, at 2:28 PM, wrote: >>» >»» Hi >»» Can you please check with pen whether he is done in 8 h bathroom. Mich=el is finished in 10b an would like to move on to the next one. Karyna did y=u have your color chosen? >>>» My floors should be dry by tomorrow, they said by Monday before they a=ded on the bedroom. But... I had painted some colors on the wall but not b=en back to select before I left. If worst comes to worst I will have to sel=ct online. >»» Also I would like to get 8 h done as soon as possible so that we can s=art on 8A. >»» where are we going to send the flooring people next, I think we h=ve run out for now with Karyna in 8 A and in 4M. >>>>> >»» Sent from my iPhone >>>> EFTA_R1_01192174 EFTA02309482 <?xml version=.0" encoding=TF-8"?> <!DOCTYPE plist PUBLIC "-//Apple/MTD PLIST 1.0//EN" "http://www.apple.com/DTDs/Propertylist-1.0.dtd"> <plist version=.0"> <dict> <kepdate-sent</key> <real>1340666814</real> <key>flags<ikey> <integer>8590195713</integer> <kev>original-mailbox</ke > <string>imap <kev>remote-id</key> <string>11723</string> <kev>subject</key> <string>Re: 8h bathroom</string> </diet> </plist> /Sent%20Messages</string> 2 EFTA_R1_01192175 EFTA02309483

Document Preview

Document Details

Filename EFTA02309482.pdf
File Size 140.1 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,056 characters
Indexed 2026-02-12T14:23:49.464358

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files