EFTA02307790.pdf
PDF Source (No Download)
Extracted Text (OCR)
DULLES GLASS & :MIRROR
9151 Euclid Ave.
Manassas, VA 20110 - USA
Tel:
Fax
Toll Free:
wwW.dullesglassandmirror.com
Printed: 5/23/2012
Customer Proposal
t m rP.O.1t
Lillie Si. James-O
Date Entered:
5/22/2012
Order #:
NO045626
Bill-To:
Project Type:
F0rtust P.O.
Product Descriptr
NO045626 - 001
Shapely
0
Ship-To:
Address Override: F
Little Saint James
6100 Red Hook Quarters Suite B-3
St. Thomas-USVI
00802
Tele
Fax:
Protect Name
Carrier: Pickup - VA
Acrylic ° 6mm -
° Clear ° Acrylic Mirror ° 3.49 SOFT •
48
X
83
84
48
CITY
SOft
1l4" Acrylic Mirror
Item -
please note this is a quote for just the acrylic mirrors. will add shipping cost later-per
sarah k
6
166.00 Act
Page 1
EFTA_R1_01186620
EFTA02307790
Project Name:
Project Type:
Carrier: Pickup - VA
FO Dust P.O.
Product Description
Order Instruction:
QTY
Son
QTY
Grand Total:
$1 .351.90
Tema and Conditions:
This proposal is valid for 30 days keen the date al the Proposal. 2 OS price" include measurements. labieason *Amery and installation of inner:IS verified above uniess Otners1:10 slated.
Price des not inciude evening or weekend mound hours Normal working haws are 700 am SO 3 Mani Mon 'Fri
3 The proposed price a subject to change A user* am any changes to the site or conligurason after the final told measurement. or options not listed in the actual proposal.
4 Before DGM will measure, customer rise? have prepared a sound. true. level arid plumb measurement area
5 NI the Material shal be lumishol in accordance fah the respective industry tolerances of color van awin thekness. sue (vs lit ). texture and performance standards.
6 DMG will not be responsible for any discrepancies in customer pcnided measurements
7 If existing obstrocton resided to be removed for installation DGM reserves the right to require customer to rrodify the working area. 11 this action is result in an installation lime increase and or
reschedule there may be edra charges
B For warranty inbernation on your specific product please visit maw dulle--glassandmirroucom Of contact your sates representative. DGM shall not be responsible lei damage to its' ork by other.
DGM will nOl be filiSPOne0e fOr special incidental Or COMOomentifil damages.
9 In Case DGM d presided labor to install 'customer provided" material, DGIA is not responsible tar any damage to OJSIOrne4.3 glass or any other materials involved n. surrounding. Of m I1V Area 01
the won being performed
10. Any item not specifically tested and priced in above bid proposal are excluded, afy changes from this proposal to hardware or material listed may cause a change in pricing and sill be
SUIeleCt 10 a sexton Change Order
11. Signed Change Orders mist be received and approved by Dulles Glass and tarror and Contractor poor to any additional work being performed and a is understood that the Change Order may
increase material delworY times and'ar Pmiong won rime
12. lead-Times given are based on information roomed by suppliers and manufacturers and are subject to change at any lime. therefore DOM shall not be held responsible for delays.
13. a Contractor assorts nonpayment due to nonpayment from GAM, Dudes Glass and Mirror reserves the right to contact said Owner regarding the status of payments on the Protect
14.One trip for Feld Meatuferrent Is. 01.10 presided inStallabOn le/OROS
included In the quoted LACS Field Measurements will be taken site/ we are notified that the areas of our scope are ready
for measurement Additional lips ledored due to openings not being ready ampler on-acceptable I nslatIman conditions wilt be result in $220.00 per tnp charge
15. FOlOwng IS (initialed Final prOteCtiOn and cleaning. GIs% Or Miste 0'481.80 by other.. Tergiva. Engineering. PerintS. Bonds. DernolitiOn Temporary EIXIOSOVS, Repairs Or Modification Of
Existing Opening or Frames. Core Drilling for Floor Closures. Any Electrical Week. udess noted in the scope of was.
18 Ceders towing up 10 $.500 CO require to be pad in luii at the Inc of order Invoice will be provided upon request
17. Removal of eutang materials may damage materials ardor SullaCe: during the removal of the said material; Dulles Glass and Mow does not assume
any reSPOrevbilay to damages Ode to or during removal 01 existing matenals.
IS. For specialty items and custom orders 50% deposit is required at the pine at acceptance and the remaining balance is due before pesup. delivery. or installation
19. Al Freight (Common Carr140) shiPMenIS ale Curb Sde DelNery.
20. DOPil Is not responsible to any existing structural issues thal may interfere with the installation andior lead to unsightly reseals Any or al structural madlcanons dal may arise before. during or after the glass
installation are explicitly the customers resconslailey
21. Al glass antler mirror products must be inspected al the lime of pea up. °tiles Glass and Mirror os not responsible for (/ass ander MOP, once it 'eaves the store premises
22. Cusbener agrees that es the event at any action or poem:dings brought for tee recovery of amounts due for products or merchanase or sante: obtained from Dulles Gass Si lamer to pay all costs of collection
including but not hinted to attorneys or collection agents fees The customer lunher agrees to pay a $35.00 fee Icr each returned one&
- ACCEPTANCE OF PROPOSAL:
I, the undersigned, accept the above mentioned descnption of work for the above price. I agree to pay a 50%
deposit for the materials and labor at the time of acceptance. as well as paying the remaining balance of the agreement at completion. The remaining
balance will be paid at the completion of work and will be charged to originial payment method in file unless otherwise other payment arrangement is
made by me at the time of payment of deposit.
Signed:
Date:
Page 2
EFTA_R1_01186621
EFTA02307791
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA02307790.pdf |
| File Size | 177.5 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 5,876 characters |
| Indexed | 2026-02-12T14:24:10.568946 |