Back to Results

EFTA02310810.pdf

Source: DOJ_DS11  •  Size: 52.5 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Sent: Thursday, June 7, 2012 3:31 PM To: Bella Klein Cc: Rich Kahn Subject: Re: Fwd: RE: Yes. On Jun 7= 2012, at 5:28 PM, Bella Klei wrote: Did JE approved this job and the cost? On J=n 6, 2012, at 2:59 PM, note: Begin forwarded message: From: Colette McGoldrick < Date:=June 1, 2012 3:09:26 PM GMT+02:00 To:' Subject: RE: Hi Attached are the 2 i=voices for 8H and 11P. We should be completely finished the=apts today. Thanks =br>Colette <=r> Original Message From: Sent: Friday, June 01, 2012 8:54 AM<=r>To: Colette McGoldrick Subject: </=pan> Hi Colette, Can you pls let me know the total=cost of the floors with the baseboards for both apts 8H and=11P please. I'm just putting together the full budget of EFTA_R1_01195206 EFTA02310810 th= apts and need to include this price. thanks very much, OUNTRY WHITE BASEBOARD.doc> COUNTRY WHITE BASEBOARD.do=> </=lockquote> 2 EFTA_R1_01195207 EFTA02310811

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02310810.pdf
File Size 52.5 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 945 characters
Indexed 2026-02-12T14:24:20.646132
Ask the Files