EFTA02315286.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
Daphne Wallace <
Sent:
Tuesday, April 30, 2019 7:34 PM
To:
michael glidden; Stephanie Remington; Patrick Cena; Rich Kahn; ann rodriquez; Karyna
Shuliak
Subject:
Shipping Updates - April 30, 2019
Greetings Mike, <=div>
I am adding an additional list until Big N returns: =/div>
STT Items for pick-up
Bryan's Plants - Dupson has req=ested Red Ixora for LSJ - (56) 3 gallon in stock - purchase pending <=iv>
<=>Arrived/Sailed/Booked to Sail
BOL 13679739 =A0- Taylor, Cotton, Ridley - (17) SPECIAL LITE DOORS, (1) QUONSET DOOR and=hardware RO and
Mechanical Buildings - on STT
=C2
=A0
4/23 - cleared, off-loaded, ready for pickup
BOL 13695258 - Reddick Equipment Co. - (1) 100 gallon 2 wheel trailer spr=yer, (1) 50 gallon 2 wheel trailer sprayer -
sailed 4/24 - EDA on
=A0
=C2 STT 4/28 - cleare=, off-loaded, ready for pickup
BOL 13677820 - EBL Watercraft - GIBBS Quadski to be returned to dealer for repairs per JE -
BOL 13623863 - 2015 GMC Yukon Denali (JE) - sail date 5/5 - EDA in Le Havre France 5/19 =C2
BOL 13640387 - 2019 Freightliner 122SD dump truck - delivered to Tropi=al FL 4/26 - cleared to sail 5/1 if space is
available
BOL 13665718 - Warren CAT - (1) Caterpillar CS54B Roller with Sh=lI Kit - NOW EDA to ready to ship from TX by 5/6
Awaiting Delivery to T=opical - Or to L.S.I via FEDEX, ETC. =AO GEI Works - Type 2 HD Permeable Silt Barrier for=GSJ -
purchased 4/8 - Lead time 4 weeks - EDA to ready to ship to Tropical=FL 5/10
American Export - LSJ GYM=Doors & Windows replacement - purchased 4/10 - Lead time 4-5 weeks - E=A to ready to
ship to Tropical FL 5/17
Hangar Doo= Specialists - TWA hangar door repairs - deposit paid 4/25 - Lead time 2-3=weeks - EDA to ready to ship
5/17
EFTA_R1_01209715
EFTA02315286
Fletcher Larkin Building Supplies - (4) cement bag for co=struction stock - purchased 3/5 - EDA to Tropical FL pending
Innovation Solar Garden Products - (2000) Garden lights - in pr=duction - Lead time 11 weeks (55 days) - EDA to MIA 38
days - EDA to=STT June 2019
Buck Steel - Project BS36653 O=der - 40 x 60 Steel building replacement for Heavy machinery storage - Eng=neering
Deposit paid 4/18 - EDA to
=AO
=C2 Tropical FL pending
2
EFTA_R1_01209716
EFTA02315287
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA02315286.pdf |
| File Size | 107.1 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,244 characters |
| Indexed | 2026-02-12T14:33:07.718889 |