Back to Results

EFTA02315286.pdf

Source: DOJ_DS11  •  Size: 107.1 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Daphne Wallace < Sent: Tuesday, April 30, 2019 7:34 PM To: michael glidden; Stephanie Remington; Patrick Cena; Rich Kahn; ann rodriquez; Karyna Shuliak Subject: Shipping Updates - April 30, 2019 Greetings Mike, <=div> I am adding an additional list until Big N returns: =/div> STT Items for pick-up Bryan's Plants - Dupson has req=ested Red Ixora for LSJ - (56) 3 gallon in stock - purchase pending <=iv> <=>Arrived/Sailed/Booked to Sail BOL 13679739 =A0- Taylor, Cotton, Ridley - (17) SPECIAL LITE DOORS, (1) QUONSET DOOR and=hardware RO and Mechanical Buildings - on STT =C2 =A0 4/23 - cleared, off-loaded, ready for pickup BOL 13695258 - Reddick Equipment Co. - (1) 100 gallon 2 wheel trailer spr=yer, (1) 50 gallon 2 wheel trailer sprayer - sailed 4/24 - EDA on =A0 =C2 STT 4/28 - cleare=, off-loaded, ready for pickup BOL 13677820 - EBL Watercraft - GIBBS Quadski to be returned to dealer for repairs per JE - BOL 13623863 - 2015 GMC Yukon Denali (JE) - sail date 5/5 - EDA in Le Havre France 5/19 =C2 BOL 13640387 - 2019 Freightliner 122SD dump truck - delivered to Tropi=al FL 4/26 - cleared to sail 5/1 if space is available BOL 13665718 - Warren CAT - (1) Caterpillar CS54B Roller with Sh=lI Kit - NOW EDA to ready to ship from TX by 5/6 Awaiting Delivery to T=opical - Or to L.S.I via FEDEX, ETC. =AO GEI Works - Type 2 HD Permeable Silt Barrier for=GSJ - purchased 4/8 - Lead time 4 weeks - EDA to ready to ship to Tropical=FL 5/10 American Export - LSJ GYM=Doors & Windows replacement - purchased 4/10 - Lead time 4-5 weeks - E=A to ready to ship to Tropical FL 5/17 Hangar Doo= Specialists - TWA hangar door repairs - deposit paid 4/25 - Lead time 2-3=weeks - EDA to ready to ship 5/17 EFTA_R1_01209715 EFTA02315286 Fletcher Larkin Building Supplies - (4) cement bag for co=struction stock - purchased 3/5 - EDA to Tropical FL pending Innovation Solar Garden Products - (2000) Garden lights - in pr=duction - Lead time 11 weeks (55 days) - EDA to MIA 38 days - EDA to=STT June 2019 Buck Steel - Project BS36653 O=der - 40 x 60 Steel building replacement for Heavy machinery storage - Eng=neering Deposit paid 4/18 - EDA to =AO =C2 Tropical FL pending 2 EFTA_R1_01209716 EFTA02315287

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA02315286.pdf
File Size 107.1 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,244 characters
Indexed 2026-02-12T14:33:07.718889
Ask the Files